A conveniently replaceable shield tail brush and a method for replacing the shield tail brush in a long-distance non-reinforced working condition

A convenient replacement, shield tail brush technology, applied in earthwork drilling, underground chambers, shaft equipment and other directions, can solve the problems of complex installation of new shield tail brushes, difficult engineering, long construction period, etc., to achieve difficult to seal weak points, Simple and convenient installation, compact and compact effect
CN111706340BActive Publication Date: 2021-11-05URBAN MASS TRANSIT ENG CO LTD OF CHINA RAILWAY 11TH BUREAU GRP

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
URBAN MASS TRANSIT ENG CO LTD OF CHINA RAILWAY 11TH BUREAU GRP
Publication Date
2021-11-05

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention provides a conveniently replaceable shield tail brush and a replacement method under long-distance non-reinforcement conditions. The shield tail brush is an annular shield tail brush spliced ​​by a plurality of shield tail brush assemblies, and each shield tail brush assembly includes at least three arc-shaped shield tail brush installation rings arranged in parallel and at least three shield tail brush assemblies. The brush mount ring piece is attached to the slide bar. When the present invention is installed, the new shield tail brush is installed on the outer ring surface of the steel structure segment through the spring bolt adjustment structure, connected with the steel structure segment to assemble together, and then in the process of excavation, first pass through the demolition port on the steel structure segment Remove the original shield tail brush, and move the new shield tail brush to the installation position of the shield tail brush during the excavation process, and install it in place through the installation port on the steel structure segment. The invention realizes the replacement of the shield tail brush during the excavation process of the shield tunnel, and does not need to carry out stratum reinforcement measures during the replacement process of the shield tail brush, reduces the construction difficulty, shortens the construction period, and saves the economic cost.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention belongs to the field of shield tunneling, in particular to a conveniently replaceable shield tail brush and a method for replacing the shield tail brush under long-distance non-reinforcement working conditions. Background technique

[0002] With the large-scale development of domestic subway construction, the shield construction method has been widely used in the construction of underground excavation rooms in subway areas due to its safety, speed, and wide adaptability. The shield tail brush of the shield machine is located at the tail of the shield main body. It is generally formed by bending the steel wire and fluffing it. It can be in close contact with the segment and mainly prevents water, mud, etc. from flowing into the shield along the back of the segment. The sealing function is a key sealing facility to prevent sand and mud gushing at the tail of the shield. The 3 sealing brushes of the shield tail brush form 2 sealing chambers...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine