Box girder formwork construction method for municipal road and bridge buildings
A construction method and construction technology, applied in the direction of bridges, buildings, bridge construction, etc., can solve the problems of easy damage, the support structure can not support the box girder formwork, etc., to avoid rapid thermal expansion, small consumables, and reduce The effect of consumables
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0031] like Figure 1-4 As shown, the embodiment of the present invention provides a kind of box girder formwork construction method for municipal road and bridge construction, comprising the following steps,
[0032] S1: when pouring concrete, start the circulating air pump 63;
[0033] S2: start the refrigeration semiconductor 612 through the electric switch 613;
[0034] S3: the air suction pipe 610 sucks the air inside the negative pressure chamber 67, and the air delive...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com