Retaining wall partition-type beam fabricating yard structure and construction method thereof
A construction method and zoning technology, which is applied in infrastructure engineering, underwater structures, artificial islands, etc., can solve the problem of line layout, drainage system layout and traffic guidance constraints, and the inability to realize complementary sharing of adjacent graded areas, reducing Issues such as the area utilization rate of the beam storage area, to facilitate the layout and the passage of related vehicles, improve the land utilization rate, and improve the ability of the beam storage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] In order to facilitate the understanding of the present invention, the following will be described in conjunction with the accompanying drawings and embodiments.
[0038] Mountainous water source protection areas have high environmental and water protection requirements, and lack of large flat sites. The cost of land acquisition outside the red line is high, the cost of later reclamation is high, and the construction of access roads for transporting beams is difficult and expensive. Therefore, prefabrication in sites outside the work area The plan of Liangchang is not feasible. In addition, the work area is located in the intercommunication circle of mountainous areas, the site is narrow and the line is in a curved section, so there are no conditions for the offline construction of beam yards for beam making, beam storage and beam lifting.
[0039] In order to solve the above-mentioned technical problems, the present invention provides a partitioned beam field structure...