Adjusting tool and method for quickly aligning large-scale turbine equipment before test run
A pre-testing, turbine technology, applied in mechanical equipment, metal processing equipment, metal processing, etc., can solve problems such as difficult to quickly and accurately align, achieve the effect of avoiding repeated adjustments, convenient operation, and reducing the number of people
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0037] This embodiment provides a kind of adjustment tooling for quick alignment before the commissioning of large-scale turbine equipment, such as Figure 1 to Figure 3 As shown, it includes a fixed support seat 1, and the center of the fixed support seat 1 is provided with a stroke hole 2 arranged along the longitudinal direction; the top surface of the fixed support seat 1 on both lateral sides of the stroke hole 2 is respectively provided with longitudinally arranged roller rows for installation. Groove 3, roller rows 4 are respectively installed in the roller row installation grooves 3;
[0038] A sliding support seat 5 is installed on the roller row 4, and the bottom of the sliding support seat 5 is arranged with a pair of sliding rails 6 matching with the roller row 4 along the longitudinal direction. The seat 5 can move longitudinally relative to the fixed support seat 1;
[0039] The center of the sliding support seat 5 is provided with a threaded hole 7, and a suppo...
Embodiment 2
[0053] This embodiment provides an adjustment method for quickly aligning large-scale turbine equipment before commissioning. This method uses the adjustment device for quickly aligning large-scale turbine equipment before commissioning as in Example 1. In this method, the fixed support seat 1 of the adjustment device for quick alignment before the test run of large-scale turbine equipment is fixed on the square box or the ground rail, and the four legs of the large-scale turbine equipment 23 are respectively placed on a corresponding large-scale turbine equipment before the test run. On the alignment adjustment device, perform quick alignment.
[0054] The specific adjustment method is:
[0055] Fix the fixed support seat 1 of the adjustment device for quick alignment before the test run of large-scale turbine equipment on the square box or the ground rail through the cooperation of the bolt and the fixed installation groove 22, and loosen the connection between the fixed sup...