The invention discloses a temporary plugging steering and large-particle-size sand adding fracturing method for a deep
coal and rock reservoir. The method comprises the measures of
viscosity control, fracture forming and sand increasing, shielding temporary plugging steering, steering sand temporary plugging, large-particle-size filling supporting and the like. Comprising the following steps that high-
viscosity liquid is adopted for making a main crack, and cleaving is started; medium-low
mucus is switched, 40 / 70-mesh proppant is continuously added, near-
wellbore zone filling and cleaving are conducted, and a shielding zone is formed; the first steering of the fracturing crack is realized by stopping and starting the pump; a far-end cleat is opened through high-
viscosity liquid, and more main seams are formed; secondary cracks and
micro cracks are expanded by adopting medium-high
mucilage liquid carrying 40 / 70-mesh proppant; medium
mucilage liquid is adopted for carrying steering sand for temporary plugging in the fracture, secondary steering of the fracturing fracture is achieved, and the fracture net is more complicated; middle-high
mucus is adopted to carry a 30 / 50-mesh proppant to realize multi-scale effective support of the complex seam net. According to the method, the
coal rock fracturing transformation volume and the crack complexity can be remarkably improved, the flow
conductivity of the support crack is improved, the measure yield is improved, and the stable production period is prolonged.