Well cementing and fracturing process and well cementing and fracturing operating tubular column
A cementing and process technology, applied in the direction of wellbore/well components, drill pipe, casing, etc., can solve the problems of high risk, long time, high labor cost, etc., to save tool cost, reduce the number of running times, and save manpower cost effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0054] The cementing and fracturing process includes the following steps;
[0055] Firstly, the outer tubing string is lowered into the predetermined position of the oil well through the tubing (drill pipe) and then fixed through the wellhead. The outer tubing string is connected in sequence by the top packer 1, the hanger 2, the tubing short 3, the cementing valve 4, and the circulation valve. 5. Salvage basket 6. First-stage containment and fracturing tool 7. Second-stage containment and fracturing tool 8. Third-stage containment and fracturing tool 9. Fourth-stage containment and fracturing tool 10. Hydraulic sliding sleeve 11. Pressure short Connector 12, floating hoop 13 and floating shoes 14; among them, the first-level isolation and fracturing tool 7, the second-level isolation and fracturing tool 8, the third-level isolation and fracturing tool 9 and the fourth-level isolation and fracturing tool 10 respectively It is composed of an open hole packer and a fracturing sl...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


