Unlock instant, AI-driven research and patent intelligence for your innovation.

A final joint system, method and final joint of immersed tube tunnel

An immersed tunnel and final technology, applied in the field of the final joint system of immersed tunnels, can solve the problems of inability to detect the installation status of joints, unable to detect the installation status of joints, and easy damage of joints, so as to facilitate remote monitoring, ensure installation accuracy and real-time The effect of strong stability and reliability

Active Publication Date: 2021-12-31
NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

At the same time, the strength, deformation characteristics, waterproof, materials and detailed structure of the joint should also be considered. However, during the installation process of the joint, there are often installation misalignments, etc., and the installation state of the joint cannot be detected, resulting in the joint being easily damaged during the installation process.
[0004] Through the above analysis, the existing problems and defects of the prior art are as follows: the installation status of the joint cannot be accurately detected during the installation process of the existing final pipe joint, resulting in damage to the joint during the installation process

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A final joint system, method and final joint of immersed tube tunnel
  • A final joint system, method and final joint of immersed tube tunnel
  • A final joint system, method and final joint of immersed tube tunnel

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0068] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0069] Aiming at the problems existing in the prior art, the present invention provides a final joint system, method and final joint of an immersed tunnel. The present invention will be described in detail below with reference to the accompanying drawings.

[0070] like figure 1 As shown, the immersed tube tunnel final joint docking system provided by the embodiment of the present invention includes:

[0071] Obstacle avoidance module 1, image acquisition module 2, last takeover height detection module 3, last takeover descent speed detection module 4, last takeover state detection module 5, display module 6, central proce...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention belongs to the technical field of tunnel construction, and discloses a final joint system and method of an immersed tube tunnel and a final joint. The final joint system of the immersed tube tunnel includes: an obstacle avoidance module, an image acquisition module, a final takeover height detection module, a final takeover descent speed detection module, a final takeover state detection module, a display module, a central processing module, a signal transmission module, and a mobile terminal , crane control module, jack adjustment module, alarm module, and finally take over the left and right movement detection module. The invention can accurately detect the installation state of the final connection during the installation process of the final connection, thereby improving the installation accuracy of the final connection and improving work efficiency. At the same time, the present invention is connected with the mobile terminal through the signal transmission module to realize the control and remote monitoring of the final takeover and installation process, and can monitor and control remotely.

Description

technical field [0001] The invention belongs to the technical field of tunnel construction, and in particular relates to a final joint system and method of an immersed tube tunnel and a final joint. Background technique [0002] At present, in the installation of the pipe section of the immersed tube tunnel, in order to make the last section of the pipe section be placed smoothly, a space longer than the distance of the pipe section must be reserved. After the last pipe section is lowered, the end surface of the last pipe section needs to be connected with the previous pipe section through a connection structure, which is the final joint. [0003] The final joint design and processing technology of immersed tunnel is one of the key technologies of immersed tunnel. The joints should be designed to withstand temperature changes, seismic forces and other effects, and ensure good watertightness. Each pipe section of the immersed tube tunnel is a prefabricated part, and there a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): E02D29/073E02D29/16E02D33/00
CPCE02D29/073E02D29/16E02D33/00E02D2600/10
Inventor 王江锋张艳英姜彤李日运李垒成孟俊贞王安明徐荣超
Owner NORTH CHINA UNIV OF WATER RESOURCES & ELECTRIC POWER