Research and development resource allocation method based on operation double-layer redundancy time reduction
A technology of redundant time and resource allocation, applied in the direction of resources, data processing applications, forecasting, etc., can solve the problems of shortened operation cycle, long operation cycle, and resource occupation by a single task.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0052] In order to better illustrate the purpose and advantages of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
[0053] In order to verify the feasibility of the method, a train research and development department is selected as an example. Assume that there are five jobs A, B, C, D, and E to be scheduled in the R&D department, where jobs A, B, C, and D are mechanical tests of four types of train chassis, and job E is the body fluid simulation of a certain type of train .
[0054] Such as figure 1 As shown, this embodiment discloses a method for allocating R&D resources based on the reduction of job double-layer redundancy time. The definition of job redundancy time and process redundancy time is as follows:
[0055] The job redundancy time t w is: the estimated duration of the job t P and the actual duration of the job t D The difference, the value rule is: when t P...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com