Construction management platform system for house building engineering

A technology for construction engineering and construction management. It is used in electrical digital data processing, processing coins or valuable banknotes, and recording/indicating the time of events. It can solve the problems of inflexible management of personnel and slow timeliness of data sharing. The effect of fast and safe data sharing, convenient and flexible management

Pending Publication Date: 2020-10-23
福建省得兴建设工程有限公司
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] The construction management of existing housing construction projects is to set up fences at the construction site, and set up card readers or other punching equipment at the gate, while the p

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction management platform system for house building engineering
  • Construction management platform system for house building engineering

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0017] In order to further understand the structure, features and other purposes of the present invention, the attached preferred embodiments are now described in detail with accompanying drawings as follows. The embodiments described in the accompanying drawings are only used to illustrate the technical solutions of the present invention and are not limiting this invention.

[0018] Such as figure 1 and figure 2 As shown, a construction management platform system for housing construction projects includes a remote management terminal 1, a management mobile terminal 2 and a user mobile terminal 3; wherein, one remote management terminal 1 can be connected to multiple management mobile terminals 2, and each management mobile terminal The terminal 2 can be connected with multiple user mobile terminals 3 .

[0019] Such as figure 1 As shown, the management mobile terminal 2 includes a body 21, a machine base 22, and a head 23. The front side of the head 23 is provided with a ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a construction management platform system for house building engineering. The construction management platform system comprises a remote management terminal, a management mobileterminal and a user mobile terminal. The remote management terminal is connected with the management mobile terminal; the management mobile terminal comprises a machine body, a machine base and a machine head part; and a touch screen and a camera are arranged on a front side of the machine head part, a cavity is formed in the front side of the machine body, a charging access cabinet is fixedly installed in the cavity, a plurality of user mobile terminals are inserted into the charging access cabinet, a control mechanism is installed in the machine body, and universal wheels are arranged at the bottom of the machine base. In the invention, the management mobile terminal is a movable intelligent robot arranged at a construction site; clock-in and clock-out operations can be carried out through the touch screen and the camera; and the user mobile terminal in the charging access cabinet is taken out to serve as a communication tool, through data interaction among the remote management terminal, the management mobile terminal and the user mobile terminal, flexible management on a construction site and personnel is facilitated, and data sharing in the construction process is faster andsafer.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a construction management platform system for building construction projects. Background technique [0002] The construction management of existing housing construction projects is to set up fences at the construction site, and set up card readers or other punching equipment at the gate, while the personnel data and progress data of general construction management are stored in personal computers. The timeliness of data sharing is relatively slow, and the management of personnel is not flexible. Contents of the invention [0003] In order to solve the deficiencies of the above-mentioned prior art, the object of the present invention is to provide a construction management platform system for house construction projects to overcome the deficiencies in the prior art. [0004] In order to achieve the above object, the present invention provides a construction manage...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G07C1/10G07F17/00G07F17/12G06K9/00G06F3/041H02J50/10
CPCG07C1/10G07F17/0042G07F17/12G06F3/0416H02J50/10G06V40/166
Inventor 徐克娜王琦王龙王炳奎吴瑞龙
Owner 福建省得兴建设工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products