Method for filling capsule anti-scaling particles for oil well
An anti-scaling and capsule technology, which is applied in the field of oil and gas fields, can solve the problems of low utilization rate of chemicals, high labor intensity, and insufficient dosing.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A method for injecting capsule anti-scaling particles for oil wells, comprising the following steps:
[0030] The first step is to obtain the amount of anti-scaling particles injected with capsules at the bottom pocket of a single oil well in the production well at one time;
[0031] The second step is to prepare the capsule anti-scaling granule filling solution;
[0032] The third step is to inject the filling liquid of the capsule anti-scaling particles into the pocket at the bottom of the well;
[0033] The fourth step is to resume production after shutting down the well for a period of time.
Embodiment 2
[0035] On the basis of Example 1, before the first step, the production wells were also flushed. Clean the production well and clean the inside of the well to ensure that the dirt in the wellbore will not affect the subsequent injection of chemicals.
[0036] In the first step, the amount of capsule anti-scaling particles injected into the pocket at the bottom of a single oil well at one time is Q=V×ρ×a×10 3
[0037] Among them, Q—the mass of anti-scaling granules added to a capsule in one well, kg;
[0038] V—the pocket volume at the bottom of the oil well, m 3 ;
[0039] ρ——Packing density of capsule anti-scaling particles, g / cm 3 ;
[0040] a—dosing ratio, 75-85%;
[0041] For the calculation of the pocket volume at the bottom of the well, see the formula:
[0042]
[0043] where V——the volume of the wellbore bottom pocket of the oil well, m 3 ;
[0044] D——the outer diameter of the casing, mm;
[0045] d - wall thickness of casing, mm;
[0046] h—the depth of...
Embodiment 3
[0049] On the basis of Example 1, before the third step, a pad liquid is also prepared and injected into the well.
[0050] The pre-liquid configuration method is to add 30-40 kg of potassium chloride and 10-20 kg of surfactant into the mixing tank, and then pour 1.5-2m 3 water, stir well.
[0051] Add 30-40 kg of potassium chloride and 10-20 kg of surfactant into the mixing tank, then pour 1.5-2m 3 Water, mix potassium chloride, surfactant and water evenly, and inject it into the well. The pre-fluid is injected through the oil well casing annulus by the injection pump. The pre-fluid can reduce the interfacial tension of oil and water, so that The oil-water separation can clean the oil on the pipe wall, prevent the capsule particles from adhering to the inner wall of the casing after being added, and reduce the use effect of the agent. At the same time, it can avoid the tools from being stuck and blocked inside the oil well. , to avoid reservoir water-sensitive characteristi...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


