[0032] Combine below Figure 1-12 In this embodiment, an integrated ceiling panel preparation system includes a transmission mechanism I1, a rolling door 4, and a transmission mechanism II5. The integrated ceiling panel preparation system also includes a support frame 2, an upper frame 3, a transmission mechanism III6, a spraying mechanism 7, The sensor mechanism 8, the exhaust mechanism 9 and the baking mechanism 10, the transmission mechanism I1 is provided with two, and the two transmission mechanisms I1 are respectively arranged at the front and rear ends of the support frame 2, and the transmission mechanism II5 and the transmission mechanism III6 are respectively Set on the front and back sides of the upper end of the upper top frame 3, the upper top frame 3 is fixedly connected to the upper end of the support frame 2, and the baking mechanism 10 is fixedly connected to the rear side of the upper end of the support frame 2, and the baking mechanism 10 is set On the lower...
specific Embodiment approach 2
[0035] Combine below Figure 1-12 Describe this embodiment, this embodiment will further explain Embodiment 1, the transmission mechanism I1 includes a pulley frame 1-1, a conveyor belt I1-2 and a motor I1-3, and the conveyor belt I1-2 is set on the pulley frame 1 -1, the motor I1-3 is fixedly connected to the pulley frame 1-1, and the output shaft of the motor I1-3 is fixedly connected to a certain pulley of the conveyor belt I1-2, and the two pulley frames 1-1 They are arranged at the front and back ends of the support frame 2 respectively.
[0036] Place the integrated ceiling panel to be sprayed on the front conveyor belt Ⅰ1-2. When placing the integrated ceiling panel, you don’t need to worry about the front and back sides, and you don’t need to worry about the position on the conveyor belt Ⅰ1-2. Just ensure the flat state. To shorten the preparation time and improve work efficiency, the front conveyor belt I1-2 drives multiple integrated ceiling panels to move backward ...
specific Embodiment approach 3
[0038] Combine below Figure 1-12 Describe this embodiment, this embodiment will further explain the first embodiment, the transmission mechanism II5 includes a motor II5-1 and a conveyor belt II5-2, and the two pulleys of the conveyor belt II5-2 are rotatably connected to the support frame 2 At the upper end, the motor II5-1 is fixedly connected to the support frame 2, and the output shaft of the motor II5-1 is fixedly connected to the pulley of a conveyor belt II5-2.