A combined cofferdam construction device and construction method
A construction device and combined technology, applied in infrastructure engineering, construction, sheet pile walls, etc., can solve the problems of large labor force, long engineering cycle, complex engineering, etc., to improve work efficiency, strong practicability, and reasonable design. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Embodiment one: a kind of combined cofferdam construction device, such as figure 1 , figure 2 , image 3 , Figure 4 , Figure 5 and Figure 6 As shown, the operation box 1 is included, the bottom of the operation box 1 is provided with a shoveling mechanism 2 for shoveling, and the two sides of the inner cavity of the operation box 1 are provided with a first limiting groove 5 for limiting the shoveling mechanism 2, The middle part of the operation box 1 is vertically provided with a second limit groove 6 for limiting the shovel mechanism 2, the top of the shovel mechanism 2 is provided with a lifting mechanism 4 for piling, and the bottom of the side of the operation box 1 is provided with a driving shovel The moving mechanism 3 of the soil mechanism 2, the bottom end of the operation box 1 is provided with a limit mechanism for fixing the position of the operation box 1, and the middle part of the top of the operation box 1 is provided with a threaded hole 7, an...
Embodiment 2
[0030] Embodiment 2. A combined cofferdam construction method. The construction steps are as follows: firstly, double-row steel pipe piles are installed, steel pipes and fasteners are used to effectively connect the steel pipe piles, and colored strips of cloth are laid inside the double-row steel pipe piles. And wooden plywood, and then put soil bags, use the self-weight of soil materials and double-row piles to further enhance the stability of the cofferdam, wood plywood plus colored strips to further improve the anti-seepage performance of the cofferdam, the soil in the soil bags adopts a combined method The cofferdam construction device excavates, and the steel pipe piles are driven into the riverbed by the shovel mechanism 2 .
[0031] The construction method of specific practical construction operations: 1. Hanging line piling: soil bag filling is excavated with a combined cofferdam construction device, and then put into the bag
[0032] 2. Mechanical piling: the area wh...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com