A Method of Roadway Layout Based on Irregular Mining Area
A roadway layout and irregular technology, applied in mining equipment, tunnels, ground mining, etc., can solve the problems of low mining efficiency, achieve the effects of reducing the driving rate, improving mining efficiency, and simplifying the roadway system
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0050] see figure 1 and figure 2 As shown, it is a schematic diagram of the first layout structure and a second layout structure diagram of the coal mining roadway provided by the present invention. In this embodiment, an auxiliary transportation roadway 1, a main transportation roadway 2, and a working face 3 for continuous mining are set.
[0051] When the roadway is excavated to point A on the extension end of the main transport roadway 2, retreat to point D to drive the joint roadway DC to increase or decrease the width of the working face, and then continue to complete the roadway excavation along the CG direction;
[0052] In the production process, when the coal mining face advances to point B, points A, B, and E are connected, and because the reloading and transportation equipment can no longer be shortened, it is necessary to withdraw the coal transportation equipment in BC section, so that the BC section cannot be shortened. The shortened reloading equipment is rel...
Embodiment 2
[0054] see image 3 and Figure 4 As shown, it is a schematic diagram of the third layout structure and a fourth layout structure diagram of the coal mining roadway provided by the present invention. In this embodiment, an auxiliary transportation roadway 1, a main transportation roadway 2, and a working face 3 for continuous mining are set.
[0055] When the roadway is excavated to point A on the extended end of the auxiliary transport roadway 1, retreat to point D to drive the joint roadway DC to increase or decrease the width of the working face, and then continue to complete the roadway excavation along the direction of CG;
[0056] In the production process, when the coal mining face advances to point C, after the three points A, C, and E are connected, the transportation and reloading equipment of the main transportation roadway 2 will not be affected, so it is only necessary to add ( Figure 4 ) or remove ( image 3 ) Hydraulic support and scraper chute. Increase the...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com