Assembled scaffolding for shipbuilding
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- CHENGXI SHIPYARD
- Publication Date
- 2022-04-19
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of ship building, in particular to an assembled scaffold for ship building. Background technique
[0002] At present, the general section of the berth is assembled. The upper side tank of the cargo hold is assembled with a hanging basket trolley and vertical gas-electric welding operation. The horizontal weld between the upper and lower side tanks of the cargo hold is operated by a channel set up by the assembled lug plate, and the segmented closing seam of the lower side tank of the cargo hold is welded and polished. And inspection, still use the conventional pipe scaffolding erection work. The scaffolding is complicated to set up, takes a long time, and the production cost is high, which reduces the welding efficiency of the closing seam of the ship, and the scaffolding is not easy to disassemble.
[0003] Therefore it is necessary to provide a new assembled scaffold for shipbuilding to solve the above problems. ...