Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Fabricated steel structure integrated green building and mounting process thereof

A green building and steel structure technology, applied in the direction of building and building structure, can solve the problems of wasting human resources, reducing work efficiency, affecting the accuracy of installation, etc., to achieve the effect of improving safety, improving work efficiency and protecting safety.

Active Publication Date: 2020-12-22
百纳装饰工程有限公司
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Aiming at the deficiencies of the prior art, the present invention provides a prefabricated steel structure integrated green building and its installation process, which has the advantages of high installation efficiency and high installation accuracy, and solves the problem of manually supporting the support rod until the nut is tightened. There will be offsets, which will affect the accuracy of installation, waste human resources and reduce work efficiency

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fabricated steel structure integrated green building and mounting process thereof
  • Fabricated steel structure integrated green building and mounting process thereof
  • Fabricated steel structure integrated green building and mounting process thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0042] see Figure 1-9 , a prefabricated steel structure integrated green building and its installation process, comprising a pre-embedded part 10, the pre-embedded part 10 is a cuboid plate, a rectangular groove is provided on the upper surface of the pre-embedded part 10, and a pre-tensioning mechanism is arranged on the pre-embedded part 10, The pre-tightening mechanism includes a pipe 1 24, a sliding block 2 25, a pull rod 26, a chute 27, a block 28, a spr...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of buildings, and discloses a fabricated steel structure integrated green building and a mounting process thereof. The fabricated steel structure integrated green building comprises a embedded part; the embedded part is a cuboid plate; a rectangular groove is formed in the upper surface of the embedded part; a pre-tightening mechanism is arranged on theembedded part; and the pre-tightening mechanism comprises a first pipeline, a second sliding block, a first pull rod, a first sliding groove, a first clamping block, a second spring, a downward moving block, a vertical rod, a second connecting rod, a fixing block, and a first vertical rod. The second connecting rod pushes the vertical rod to slide downwards in the first pipeline, and the verticalrod drives the downward moving block to compress hydraulic oil in the first pipeline and pushes the second sliding block to slide in the first pipeline, and the second sliding block drives the firstpull rod to drive the first clamping block to slide out of the first sliding groove to be attached to the side wall surface of the fixing block, so that the fixing block is fixed to the embedded part,the pre-tightening mechanism replaces manual supporting of the first vertical rod, and therefore the manual supporting of the first vertical rod is not needed, so that the probability of deviation ofthe first vertical rod caused by human factors is reduced, the manual workload is reduced, the working efficiency when the embedded part is placed is improved, and the installation precision is improved.

Description

technical field [0001] The invention relates to the technical field of buildings, in particular to an assembled green building with an integrated steel structure and an installation process thereof. Background technique [0002] With the rapid development of my country's construction industry, prefabricated buildings are being promoted. Compared with traditional concrete pouring buildings, prefabricated buildings are flexible and convenient to install, especially the prefabricated steel structure buildings, which are light in weight and transport different parts. Go to the construction site, and then assemble the various parts. When assembling the various parts, bolts and nuts are usually used to connect them. When the support rod falls, in order to ensure safety and installation accuracy, it is necessary to manually support the support rod until the nut is tightened. Due to manual support, there will be deviation, and a small deviation will affect the installation accuracy, t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E04B1/41E04B1/58E04B1/24
CPCE04B1/2403E04B1/41E04B1/58
Inventor 郭红艳
Owner 百纳装饰工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products