Lightweight APS double-bridge planning system

A lightweight, planned technology that can be used in the manufacture of computing systems, calculations, instruments, etc., to solve problems such as inability to provide resource capabilities

Pending Publication Date: 2021-01-26
上海才匠智能科技有限公司
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

This MRP cannot provide a valid resource capacity
In ERP's multi-factory collaborative processing BOM material package plan (as shown in the figure below), the final product of the local factory needs the processing orders of the two foreign factories to complete the seamless connection in terms of processing time (beat). However, ERP only To ideally complete the planning of these two out-of-town factories and local factories

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Lightweight APS double-bridge planning system
  • Lightweight APS double-bridge planning system
  • Lightweight APS double-bridge planning system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0048] see figure 1 , this embodiment provides a technical solution: a lightweight APS dual-bridge planning system, including a basic file module, a production capacity reservation module, a workshop planning module, an order scheduling module, and a workshop scheduling module.

[0049] The basic file module is used to: define production lines by organization. Maintain the cross relationship between production lines and items. In order to calculate the capacity of production lines more accurately, the production capacity of production lines will be counted according to man-hours. When importing, orders will be automatically divided by production lines. If the production line already exists, the corresponding row will be inserted, otherwise Add a production line-item cross-tab header, and verify organization + production line + item does not allow duplication. Set the order and priority of scheduling. Set the default priority order for customers.

[0050] The capacity reserv...

Embodiment 2

[0083] In this embodiment, based on the lightweight APS double-bridge planning system provided in Embodiment 1, the actual operation of Suzhou Zhongcheng New Energy Co., Ltd. on each production line is analyzed and a lightweight APS double-bridge planning system is developed. APS module. Include the following steps:

[0084] Enter ERP (OBA import) for large customer contracts or orders for goods—>sales pre-production planning (lightweight APS / MDS)—>MPS—>MRP—>workshop scheduling (lightweight APS)—>MES / WMS / SRM implements production processing and procurement tasks.

[0085] The role of the first bridge "sales pre-production plan":

[0086] In the process of production management, in order to achieve the best balance between demand and supply, the demand plan is the source of the production plan. The source of production scheduling is based on two dimensions of customer orders and inventory production (except for new product development). After the customer order is placed, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention is applicable to the technical field of production and processing management, and provides a lightweight APS double-bridge planning system, which comprises a basic file module, a capacity reservation module, a workshop planning module, an order pre-arrangement module and a workshop scheduling module, and can effectively solve the problem that after receiving customer order information or customer change order information, customer orders and order change information are put into a sales pre-scheduling system at the first time, whether products, production lines and materials canmeet the delivery time requirements of customers or not is automatically predicted through an informatization system, results are fed back to the customers in time, and business negotiation is conducted with the customers to achieve consensus.

Description

technical field [0001] The invention belongs to the technical field of production and processing management, in particular to a lightweight APS double-bridge planning system. Background technique [0002] At present, in the application process of ERP in enterprises, ERP cannot keep abreast of the delivery capabilities of future products in the workshop and production line in the front-end sales. Whether the corresponding production resource supply capacity meets the customer's delivery requirements, the lightweight APS double-bridge planning system simulates the production capacity of the back-end production line to the front-end sales system, and the sales staff can quickly and conveniently determine whether they can meet the delivery requirements proposed by the customer. Meet deadlines, deliver on schedule, and improve customer satisfaction. [0003] The basic working principle of the ERP system is as follows: the production planning and scheduling personnel of the enter...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/04G06Q10/06G06Q10/08G06Q50/04
CPCG06Q10/04G06Q10/0631G06Q10/087G06Q50/04Y02P90/30
Inventor 杨志东李强
Owner 上海才匠智能科技有限公司