Municipal engineering measurement positioning method and system
A technology for engineering surveying and positioning methods, applied in structured data retrieval, instruments, geographic information databases, etc., can solve problems such as multiple rework, impact on construction period, and inability to coordinate, so as to improve accuracy, facilitate modification and correction, and improve measurement The effect of precision
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] Additional aspects and advantages of embodiments of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by practice of embodiments of the invention.
[0041] figure 1 It is a flow chart of a municipal engineering survey and positioning method provided according to an embodiment of the present invention, as shown in figure 1 As shown, the method includes:
[0042] S1: Acquire urban geographic information data and create a GIS electronic map.
[0043] S2: Establish the BIM model of the proposed buildings and structures based on the urban geographic information data.
[0044] S3: uploading the GIS electronic map and the BIM model to the AR measurement platform for labeling position information.
[0045] S4: Carry out simulated measurement and positioning of the BIM model according to the position labeling results, and determine the position coordinates of buildings and structures.
[0046...
Embodiment 2
[0059] image 3 It is a schematic structural diagram of a municipal engineering survey and positioning system provided according to an embodiment of the present invention, as shown in image 3 shown, including:
[0060] Data acquisition module 1, used for urban geographic information data;
[0061] GIS database 2, for setting up GIS electronic map according to described city geographic information data;
[0062] BIM model generation module 3, is used for generating the BIM model of building, structure to be built according to described urban geographic information data;
[0063] The AR measurement and positioning module 4 is used to upload the GIS electronic map and the BIM model to the AR measurement platform for position information labeling, and perform simulated measurement and positioning of the BIM model according to the position labeling results to determine buildings and structures location coordinates.
[0064] Specifically, in the data collection module 1, the co...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com