Sponge city rainwater garden aided design system and method
A rain garden and auxiliary design technology, applied in computing, structured data retrieval, resources, etc., can solve the problems of low efficiency in the design of rain gardens in sponge cities, and achieve the effect of improving statistical accuracy.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0030] Such as figure 1 As shown, the sponge city rain garden aided design system includes a local terminal and a server. In this embodiment, the local end is a computer installed with a corresponding software program. The server is a Tencent Cloud server, and in other embodiments, a Huawei Cloud server or a distributed server can also be selected. The local end communicates with the server through broadband.
[0031] The local end is used to associate the area information parameters in the CAD file with the primitive object, and also to calculate the proportion of the design area and the underlying surface area according to the parameters bound by the CAD primitive object, and form the database form information And send it to the server; the local end is also used to count and compare the elevation in the design area according to the parameters bound by the CAD primitive object, and obtain the lowest elevation in the area and form a label; the local end is also used to use ...
Embodiment 2
[0039] The difference from Embodiment 1 is that in this embodiment, the local end further includes a collection unit for collecting the user's operation data; the local end also includes an analysis unit for analyzing the user's work habits based on the user's operation data;
[0040] The analysis unit is also used to judge whether the model is produced sequentially for multiple parts according to the production data of the model; when multiple parts are produced sequentially, use the preset model to divide the completed part into sub-models according to the order of production, And number the submodels in the order they were made.
[0041] The analysis unit is also used to analyze whether the next no-operation time is greater than the preset single-block analysis time according to the user's work habits when the acquisition unit does not collect user operations; when it is greater than the single-block analysis time, the analysis unit follows the preset In the model of , chec...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 
