Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Prefabricated comprehensive pipe gallery

A technology of comprehensive pipe gallery and gallery body, which is applied in water conservancy projects, artificial islands, railway inspection vehicles, etc., can solve the problems of increasing the labor intensity of maintenance workers and consuming physical strength.

Active Publication Date: 2021-02-02
成都城投建筑工程有限公司
View PDF7 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] After the pipes are installed in the prefabricated integrated pipe gallery, maintenance workers need to regularly check the pipes in the installed pipe gallery. Due to the long length of the integrated pipe gallery, maintenance workers generally need to walk on foot, which consumes a lot of physical strength and increases Increased labor intensity of maintenance workers

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Prefabricated comprehensive pipe gallery
  • Prefabricated comprehensive pipe gallery
  • Prefabricated comprehensive pipe gallery

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0039] The following is attached Figure 1-8 The application is described in further detail.

[0040] The embodiment of the present application discloses a prefabricated comprehensive pipe gallery. refer to figure 1 , The prefabricated comprehensive pipe gallery includes a gallery body 1, and the gallery body 1 is a rectangular body with a hollow interior and openings on both sides. Pipe placement areas 11 are provided on both sides of the gallery body 1, and the pipe placement areas 11 are used to place the pipe body; an inspection area 12 is provided at the positions of the pipe placement areas 11 on both sides in the gallery body 1, and the inspection area 12 can For pedestrians to move around. The inspection area 12 is provided with rails 121 , two rails 121 are provided, and the length direction of the two rails 121 is consistent with the length direction of the gallery body 1 . An inspection car 2 is installed on the track 121 to move, and the inspection car 2 includ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a prefabricated comprehensive pipe gallery. The prefabricated comprehensive pipe gallery comprises a gallery body, pipeline placement areas are arranged on the two sides in the gallery body, inspection areas are arranged at the positions, located on the two sides, of the pipeline placement areas in the gallery body, rails are arranged in the inspection areas, the length direction of the rails is consistent with that of the gallery body, an inspection vehicle is movably arranged on the rails, the inspection vehicle comprises two moving bodies, the two moving bodies aredetachably connected, driving devices are arranged on the two moving bodies, and the driving devices drive the moving bodies to move on the rails. The prefabricated comprehensive pipe gallery has theeffect of reducing the labor intensity of a next maintenance worker entering the pipe gallery during inspection in the pipe gallery.

Description

technical field [0001] The present application relates to the field of construction of underground pipe gallery, in particular to a prefabricated comprehensive pipe gallery. Background technique [0002] Comprehensive pipe gallery is the comprehensive corridor of underground urban pipelines, that is, to build a tunnel space underground in the city, integrating various engineering pipelines such as power, communication, gas, heating, water supply and drainage, etc., with special inspection ports and hoisting ports And monitoring system, the implementation of unified planning, unified design, unified construction and management is an important infrastructure and "lifeline" to ensure the operation of the city. The prefabricated comprehensive pipe gallery does not require on-site pouring and molding, and is directly transported to the site for hoisting after it has already been formed , thereby greatly shortening the construction period. [0003] After the pipes are installed i...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D29/045E02D29/12B61D15/12
CPCB61D15/12E02D29/045E02D29/12
Inventor 全刚赵举冯弋倬
Owner 成都城投建筑工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products