Plugging structure of basement equipment room and construction method thereof
A technology for equipment rooms and basements, which is applied in the processing of building components, building structures, building materials, etc., can solve the problem of low stability of the connection between the cover plate and the hoisting port, and achieve the effect of improving the connectivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0042] The following is attached Figure 1-6 The application is described in further detail.
[0043] refer to figure 1 , 2 , The hoisting port 2 for hoisting equipment is reserved on the basement roof 1.
[0044] The embodiment of the present application discloses a sealing structure for a basement equipment room. refer to figure 1 , 2 , the sealing structure includes a cast-in-place slab 3 and a suspended formwork 4 fixedly connected to the lower surface of the cast-in-place slab 3 . The suspended formwork 4 covers the bottom end of the hoisting opening 2 , and the upper surface of the suspended formwork 4 is fixedly connected to the lower surface of the top plate 1 through an adhesive sealant layer 5 . The upper surface of the top plate 1 is reserved to form a receiving groove 6. The receiving groove 6 is coaxially arranged around the lifting opening 2. The groove wall on one side of the receiving groove 6 is arranged flush with the opening wall of the lifting opening...