Settlement monitoring device for reinforcing highway soft soil foundation through preloading method and method
A soft soil foundation and settlement monitoring technology, which is applied in the field of foundation soil survey, foundation structure engineering, construction, etc., can solve the problems of internal settlement misjudgment and other problems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0064] Specific Example 1: Subsidence Monitoring of Highway Soft Soil Foundation Strengthened by Heaping Preloading Method
[0065] (1) Excavate a pit twice the size of the concrete base in the foundation. The depth of the bottom of the pit should be deeper than that of the soft soil layer. Level the bottom of the pit, place the concrete base in the pit, and cover the pit with soil. fill up.
[0066] (2) Install the device according to the method of use of the present invention, and backfill the soft ground layer in the pit.
[0067] (3) Read the readings of the laser rangefinder according to the landfill time to obtain the settlement of the highway soft soil foundation.
specific Embodiment 2
[0068] Specific embodiment 2: monitoring of expressway subgrade deformation during operation
[0069] The subgrade deformation of the expressway during the operation period is one of the main indicators to reflect the operation status of the highway. This equipment can monitor the deformation of the subgrade of the expressway at different depths to further evaluate the operation status of the expressway. Mainly through the following steps:
[0070] (1) Install the concrete foundation of the equipment on the foundation of the isolation zone in the middle of the highway at the initial stage of expressway construction, and assemble the guide rod, pull piece and steel wire rope of the equipment during the construction of the expressway subgrade.
[0071] (2) After the expressway is completed, the deformation reading device is installed on the guide rod.
[0072] (3) Read the initial reading of the laser range finder on the deformation reading device.
[0073] (4) During the oper...
specific Embodiment 3
[0074] Specific Example 3: Monitoring of Consolidation and Settlement of River Flush Fill
[0075] The main measure of river dredging is to use machinery to extract the flushing soil in the river to the back side of the embankment. The backfill soil consolidates and settles under the action of its own weight, and its strength gradually increases to reinforce the embankment. However, the internal deformation of the backfill soil cannot be monitored, and the degree of internal consolidation cannot be estimated. The equipment of the present invention can be used to hedge The internal settlement of the fill is monitored, and the main steps are as follows:
[0076] (1) Dig out a pit twice the size of the concrete base on the backfill foundation, level the bottom of the pit, put the concrete base in the pit, and fill the pit with soil.
[0077] (2) Assemble the equipment according to the usage method of this equipment.
[0078] (3) After assembling the device, take the initial rea...