Method for processing suspended top by in-hole segmented millisecond blasting

A technology of differential blasting and blasting, which is used in blasting, earth-moving drilling, discharging machinery, etc.

Pending Publication Date: 2021-02-12
GANSU JIU STEEL GRP HONGXING IRON & STEEL CO LTD
View PDF5 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, during the blasting of medium and deep holes in underground mines, due to the corresponding upper level abandoned piercing veins, no effective caving is carried out, and the newly mined piercing veins are likely to form a suspended roof phenomenon. Currently, the hole expansion method is used to deal with the suspended ceiling. It means that after the overhang occurs, find out the supporting part of the arch foot of the overhang, charge and ream the corresponding part of the overhang foot in the follow-up platoon to form a medicine pot, and then charge the medicine pot, and make the overhang through blasting. The project loses the support of the arch foot, so as to deal with the suspended roof. The advantage of this treatment method is good reliability, but the disadvantage is that the process is cumbersome and takes a long time. The vault loses its support balance, and the vault naturally collapses against the ground pressure. Secondly, the upper vault is destroyed as much as possible, and it is blasted through the upper segmental covering layer, forming the condition for the vault to disintegrate and collapse. Due to the insufficient pressure of the upper horizontal covering layer Moreover, the height of the suspended roof is too low, causing the top of the horizontal stope to collapse against the pressure of the ground pressure; when the hole reaming method is used to deal with the suspended roof, hole reaming is required, resulting in the blasting operators being exposed to the suspended roof area for many operations and high labor intensity. Due to the need to charge the medicine pot with the hole-enlarging method, the amount of explosive required is large.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method for processing suspended top by in-hole segmented millisecond blasting

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.

[0021] Such as figure 1 As shown, a method for processing suspended ceiling 1 by segmental differential blasting in a hole comprises the following steps:

[0022] Distance measurement: measure the height of the suspended ceiling 1;

[0023] Open blast hole 3: according to the height of the different positions of the suspended top 1, open a plurality of blast holes 3 suitable for the height of the suspended top 1 from the piercing vein 2 on the suspended top 1; The cross-section along the length direction of the vein 2 is radially distributed, and a plurality of blastholes 3 are equally spaced along the length direction of the piercing vein 2;

[0024] Charge for the first time: charge in the middle and deep hole in the upper part of the blast hol...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a method for processing a suspended top by in-hole segmented millisecond blasting. The method comprises the steps of distance measuring, blast hole forming, primary explosive filling, secondary explosive filling, secondary filling and blasting. Each blast hole sequentially comprises a filling section, an explosive section, a filling section and an explosive section from bottom to top; during blasting, a medium-depth hole in the lower half part is firstly blast and a medium-depth hole in the upper half part is then blast; the medium-depth hole in the lower half part is firstly blast to provide a new downward free surface for the medium-depth hole in the upper half part; after blast, the medium-depth hole in the lower half part forms a small crack in the wall of the medium-depth hole in the upper half part, so that the medium-depth hole in the upper half part blasts gas during blasting to form a gas wedge effect which is combined with stress superposition effect of millisecond blasting to improve utilization of blasting energy, so that effective damages to a suspended top region are formed, and the suspended top collapse probability is increased; while the suspended top is processed, operation times, in the suspended top region, of blasting operators during suspended top treatment can be reduced, and the labor intensity is reduced; and needed explosive amount is smaller in comparison with that of a hole-expanding method.

Description

technical field [0001] The invention belongs to the field of methods for treating suspended roofs of mines, and in particular relates to a method for treating suspended roofs by segmental differential blasting in holes. Background technique [0002] At present, during the blasting of medium and deep holes in underground mines, due to the corresponding upper horizontal abandoned piercing veins, no effective caving is carried out, and the newly withdrawn piercing veins are likely to form a suspended roof phenomenon. At present, the hole expansion method is used to deal with the suspended ceiling. It means that after the overhang occurs, find out the supporting part of the arch foot of the overhang, charge and ream the corresponding part of the overhang foot in the follow-up platoon to form a medicine pot, and then charge the medicine pot, and make the overhang through blasting. The project loses the support of the arch foot, so as to deal with the suspended roof. The advantage...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F42D3/04F42D1/00F42D1/08E21C37/00
CPCF42D3/04F42D1/00F42D1/08E21C37/00
Inventor 徐海李金平钮卫军
Owner GANSU JIU STEEL GRP HONGXING IRON & STEEL CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products