Separated pouring construction method for concrete of different strength grades at beam-column joint
A technology of strength grades and beam-column joints, which is applied in the direction of construction, building structure, and building material processing, can solve the problems of waste of steel wire mesh, waste of manpower, and difficulty in binding steel mesh, achieving wide applicability, saving labor, and The effect of improving the molding effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0032] see Figure 1-2 , a construction method for separate pouring of concrete with different strength grades at beam-column joints, comprising the following steps:
[0033] S1. Construction preparation:
[0034] Material preparation: According to the construction drawings and project conditions, a detailed material procurement plan was prepared. The combined steel baffle has been processed and can be used in one pouring section, and the steel bars and formw...