A kind of construction method of up-type mobile formwork high-altitude variable bridging length
A construction method and technology of mobile formwork, which is applied in the direction of erecting/assembling bridges, buildings, bridge construction, etc., can solve the problems of increasing the installation and dismantling workload of mobile formwork, increasing the construction risk factor, reducing construction work efficiency, etc., and shortening the construction time The construction period of the box girder, the improvement of construction efficiency and quality, and the effect of improving construction efficiency
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0056] In order to make the objectives, technical solutions and advantages of the present invention clearer, the technical solutions of the present invention will be clearly and completely described below with reference to the embodiments of the present invention. Obviously, the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
[0057]According to the different ways of through holes, the mobile formwork can be divided into three types: upward mobile formwork, downward mobile formwork and composite mobile formwork. The main beam of the mobile formwork is above the cast-in-place box girder, and the upward moving formwork is displaced by the completed box girder and bridge pier. The upward moving formwork used in the present invention can be the up...