An earthwork excavation and construction method technology, which is applied in infrastructure engineering, chemical instruments and methods, excavation, etc., can solve the problems of low excavation construction efficiency, weak load-bearing capacity, collapse and other problems, so as to improve construction safety and construction efficiency. , The effect of reducing the cost of reuse and cleaning, and reducing the cost of return transportation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0058] Attached to the following Figure 1-9 This application will be described in further detail.
[0059] The embodiment of the present application discloses a construction method for earthwork excavation of a deep foundation pit. refer to figure 1 and figure 2 , a construction method for deep foundation pit earthwork excavation comprises the following steps:
[0060] Step S1, construction preparation, divide the construction site into a plurality of excavation areas, and carry out a load-bearing test on each excavation area to determine the number of engineering equipment that can be excavated at the same time; the load-bearing test method is: Place the load-bearing plate at a point, and place engineering equipment or materials of equal weight on the load-bearing plate. After at least 48 hours, determine the load-bearing capacity of the soil layer according to the subsidence of the load-bearing plate. Generally, the subsidence is within 10mm. load bearing requirements....