Engineering supervision method based on BIM system

A technology of supervision and engineering, which is applied in the field of engineering supervision based on BIM system, can solve the problems that it is difficult to grasp the dynamic information of the 3D model of the construction project in time, the modification information of the 3D model of the construction project is difficult to transmit in time, and the progress of the supervision work is affected. Flexible, fast modification, and convenient modification effects

Pending Publication Date: 2021-04-06
广东建瀚工程管理有限公司
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, after the BIM system of a building is established, the supervisor will continuously make adaptive modifications to the 3D model of the construction project in the BIM system during the construction supervision process, and there are many units and departments involved in the project supervision, and the 3D model of the construction project It is difficult to transmit the modification information of the project to each unit and department in time, and it is difficult for each unit and department to grasp the dynamic information of the 3D model of the construction project in time, which makes the supervision information between the various units and departments deviate, which affects the progress of the supervision work
[0006] In view of the above-mentioned related technologies, the inventor believes that there is a defect that the modification information of the 3D model of the construction project in the existing engineering supervision BIM system is difficult to be transmitted to various units and departments in time, which affects the progress of the supervision work

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Engineering supervision method based on BIM system
  • Engineering supervision method based on BIM system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0048] This specific embodiment is only an explanation of this application, and it is not a limitation of this application. Those skilled in the art can make modifications to this embodiment without creative contribution according to needs after reading this specification, but as long as the rights of this application All claims are protected by patent law.

[0049] In order to make the purposes, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments It is a part of the embodiments of this application, not all of them. Based on the embodiments in this application, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of this application. ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention aims to provide an engineering supervision method based on a BIM system. The method comprises the steps of obtaining a standard building engineering three-dimensional model; creating a plurality of supervision roles on the three-dimensional model of the constructional engineering, enabling the plurality of supervision roles to be bound with mobile equipment identification codes of different supervision personnel, and enabling the mobile equipment bound with the mobile equipment identification codes to establish communication connection with the BIM system; modifying the standard three-dimensional model of the constructional engineering by means of the mobile equipment bound with the mobile equipment identification code; and enabling the mobile equipment bound with the mobile equipment identification code to transmit the modified three-dimensional model information of the constructional engineering to the three-dimensional model of the constructional engineering, and update the three-dimensional model of the constructional engineering in real time. The problem that the supervision work progress is affected due to the fact that modification information of the three-dimensional model of the constructional engineering in an existing engineering supervision BIM system is difficult to transmit to all units and departments in time is solved, and the method has the effect of updating the three-dimensional model of the constructional engineering in real time.

Description

technical field [0001] This application relates to the technical field of engineering supervision, in particular to a BIM system-based engineering supervision method. Background technique [0002] Project supervision refers to controlling the quality, cost and progress of construction projects during the construction stage, managing contracts and information, coordinating the relationship between relevant parties in project construction, and Service activities to perform the legal duties of safety production management of construction projects. [0003] At present, the BIM system establishes a virtual three-dimensional model of the construction project and uses digital technology to provide a complete and consistent construction engineering information library for the three-dimensional model of the construction project. The information base not only contains geometric information, professional attributes and state information describing building components, but also contain...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/10G06Q50/08G06F30/13G06F30/20G06T19/20G06F21/31G06F16/58G06F111/02
CPCG06Q10/103G06Q50/08G06F30/13G06F30/20G06T19/20G06F21/31G06F16/5866G06F2111/02G06T2210/04
Inventor 胡罕才胡湘李忠良王齐明谭小谦郑奖妹
Owner 广东建瀚工程管理有限公司