Construction method for road reconstruction with pavement subsidence

A construction method and road technology, applied in the direction of roads, roads, road repairs, etc., can solve the problems of low construction cost, limited reinforcement effect of soft soil foundation, high construction cost, etc.

Active Publication Date: 2021-04-16
BEIJING ZHIPAN DIGONG TECH DEV CENT
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In the road reconstruction construction method of strengthening the soil of the soft soil foundation by cement mixing, a plurality of microscopic holes are opened in the area where the subsidence of the road surface occurs in the road surface, and through the microscopic holes, with the aid of cement mixing equipment, the The soft soil foundation soil under the subgrade is reinforced. The advantage of this construction method is that it is not necessary to destroy the road surface in a large area, and it is not necessary to excavate the subgrade in a large area, and the construction cost is low. The disadvantage of this construction method is the reinforcement of the soft soil foundation soil. The effect is limited, and the pavement will still collapse after the renovation
as passed Figure 13 As shown in the cross-sectional view of the road reconstructed by the construction method of road surface settlement reconstruction in the prior art, in the construction method of road reconstruction using ordinary rigid piles for reinforcement, the subgrade soil of the road surface 1 In the soft soil foundation soil 2 below the 3, a plurality of ordinary rigid piles 4 are arranged, and cap beams 9 are arranged on the tops of the plurality of ordinary rigid piles 4, and the subgrade soil 3 is supported by the cap beams 9. The construction method The advantage of this method is that it effectively solves the problem of subsidence of the road surface 1 after road reconstruction and use, and the reinforcement effect of the soft soil foundation soil 2 below the roadbed soil 3 is better. At the top of the top, a cap beam 9 is set to support the subgrade soil 3, so a pile 4 with a larger diameter and a longer length must be used. The pile bottom of the pile 4 is generally required to extend into the bearing layer 7, and a large area must be used. Excavate the road surface 1 and roadbed soil 3, so the construction cost is relatively high

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method for road reconstruction with pavement subsidence
  • Construction method for road reconstruction with pavement subsidence
  • Construction method for road reconstruction with pavement subsidence

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0053]Next, a construction method of the road surface settlement modification occurring as an embodiment of the present invention is specifically described.

[0054]In accordance with an embodiment of the present invention, the construction method of the pavement settlement is first performed, in this step a), a settled area occurs in the road surface 1 of the road, and a plurality of pile holes 10, such asfigure 1 The state shown as the step of opening the pile hole 10 in the construction method of the road surface settlement occurred as an embodiment of the present invention, the pile hole 10 is by means of a drilling machine by a drilling machine (The pile hole 10 is formed in the soft soil layer 2 in the pile hole 10 in the pile hole 10 in the pile hole 10, and the pile hole 10 may not extends into the holding layer 7.

[0055]The construction method of the road surface settlement occurred as an embodiment of the present invention is carried out.figure 1 After step a), step b1) is per...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

Provided is a construction method for road reconstruction with pavement subsidence, which can significantly reduce construction costs while satisfying the requirement for road surface subsidence that does not occur significantly after the use of a reconstructed road for a long period of time. The method comprises the following steps: a) forming a plurality of pile holes (10) in a settlement area of a road; b) forming a branch cavity and / or a disk cavity (11) in the pile hole (10) in an extrusion manner; c) extruding the surrounding soil body (3) in the transverse direction at an elevation position near the position of the subgrade soil bottom surface in the pile hole (10) to form a pile top soil supporting structure body cavity (12) for the pile top soil supporting structure body (8), which protrudes outwards by taking the pile hole (10) as the center; d) pouring concrete (14) into the pile bore (10) to form a concrete pile (4) with a support (5) and / or a disk (16), and e) pouring concrete (15) into the pile-jacking soil structure body cavity (12) to form a pile-jacking soil structure body (8).

Description

Technical field[0001]The present invention relates to the construction method of the present invention relates to the transformation of the old road.Background technique[0002]In the past, my country's road, especially the highway was often built on the soft soil base. Due to the construction process, the construction process is not limited, or the quality is not high, and the construction of the road will often occur in the road settlement. Finally, the road is collapsed. In response to the path of collapse of such a road, the construction method of conventional road transformation includes the construction method of the road transformation of the roadbed and the construction method of the road transformation of the rigid pile and the road transformation of rigid piles. In the construction method of the road transformation of the soil of the soft soil, the road transformation of the soil of the soft soil is reinforced, and a plurality of minute holes are opened, and the micropores a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01C23/10E01C3/00E02D5/34
Inventor 张国梁易绍平孙向东徐永洁张智胤黄海林倍东唐后国郑坚强
Owner BEIJING ZHIPAN DIGONG TECH DEV CENT
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More