Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Railway bridge constructor risk management system and method

A technology for risk management and bridge construction, applied in data processing applications, instruments, calculations, etc., can solve problems such as insufficient safety knowledge and awareness of safety precautions, low education level of workers, and low efficiency of safety management, and achieve integrated information management , Improving the behavior of not wearing a helmet and improving the efficiency of safety management

Pending Publication Date: 2021-05-18
NANJING UNIV OF SCI & TECH
View PDF3 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

The safety supervision process is mainly carried out by safety management personnel based on the content of the safety inspection with their own knowledge reserves and experience. Not only is it time-consuming and laborious, and the whole process cannot be monitored in real time, but it often leads to untimely, incomplete or wrong feedback of monitoring information. , making security management inefficient and ineffective
Especially for the safety of workers, although warning signs and protective devices are used to protect dangerous areas, and on-site managers and team leaders are used to restrain the safety of personnel, human behavior is difficult to control, so using this traditional safety supervision method has significant limitations
On the one hand, relying on the senses and awareness of managers and team leaders to judge the abnormal behavior of other operators is not only easy to misjudgment, but also unable to guarantee the safety of all personnel
On the other hand, the on-site workers are mainly migrant workers, temporary workers and other types of workers. These workers have problems such as low education, lack of vocational skills training, lack of safety knowledge and awareness of safety precautions, etc.
Even with all kinds of safety education and training, risky behaviors such as not wearing helmets and seat belts are still the norm

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Railway bridge constructor risk management system and method
  • Railway bridge constructor risk management system and method
  • Railway bridge constructor risk management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0027] The solutions of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0028] A risk management system for railway bridge construction personnel, comprising a risk data collection device, a communication network, a management platform and an alarm device, the risk data collection device interacts with the management platform through a communication network; the risk data collection device includes a wireless positioning module, The status monitoring module is used to collect risk data related to personnel safety at the construction site; the management platform includes a basic information management module, a risk processing module and a risk database module, which are used to store and process personnel risk-related data and provide a visual interface for personnel risk And alarm prompts, and equipped with login and operation authority; the alarm device includes vibration alarm and sound and ligh...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a railway bridge constructor risk management system and method. The system is characterized in that the system comprises a risk data collection device, a communication network, a management platform, and an alarm device, wherien the risk data collection device interacts with the management platform through the communication network; the risk data collection device comprises a wireless positioning module and a state monitoring module and is used for acquiring risk data related to personnel safety on a construction site; the management platform comprises a basic information management module, a risk processing module and a risk database module, and is used for storing and processing personnel risk related data, providing a personnel risk visual interface and an alarm prompt, and providing login and operation authorities; and the alarm device prompts related personnel in time after receiving alarm information sent by the management platform. According to the invention, real-time safety monitoring and early warning of railway bridge construction site operation personnel can be realized, so that the workload of construction site safety management personnel is reduced, and the safety management efficiency can be improved.

Description

technical field [0001] The invention belongs to the technical field of engineering project management, and specifically relates to a risk management system and method for railway bridge construction personnel. Background technique [0002] With the rapid development of social economy, the construction requirements of railway bridges are getting higher and higher, the number of engineering projects is increasing sharply, and the number of employees is also increasing year by year. At the same time, construction safety issues are also constantly occurring, and accidents are still in the stage of frequent occurrence. [0003] At present, the safety management mode and method adopted in my country's railway bridge construction sites mainly rely on manual timing and fixed points for on-site supervision and hidden danger investigation, use remote video monitoring systems for safety monitoring in important places, and conduct safety education and training for construction workers. ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08
CPCG06Q10/0635G06Q50/08
Inventor 徐骏善薛冬艳柳林燕汪惠芬
Owner NANJING UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products