Hydraulic creeping formwork construction device for hollow high pier of expressway bridge and using method of hydraulic creeping formwork construction device
A hydraulic climbing formwork, expressway technology, applied in the direction of bridges, bridge materials, bridge construction, etc., can solve the problems of preload error, waste, waste of material and man-hours, etc., to reduce the workload, stabilize the equipment, and solve the waste of materials Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them; based on The embodiments of the present invention and all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0038] Such as Figure 1-15 Shown, a kind of highway bridge hollow high pier hydraulic climbing formwork construction device of the present invention comprises pressure regulating device 1, active device 2 and driven device 3, and described pressure regulating device 1 is located on driven device 3, and described The active device 2 is located on the driven device 3; the pressure regulating device 1 includes a lower liquid storage tank 4, a liqu...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


