Unlock instant, AI-driven research and patent intelligence for your innovation.

Urban rail transit general contract site safety management system and method

A technology of urban rail transit and safety management, applied in the field of on-site safety management system of urban rail transit general contracting, to achieve the effect of improving processing efficiency

Pending Publication Date: 2021-06-22
江苏省城市轨道交通研究设计院股份有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Aiming at the existing problems in the prior art, the present invention provides an on-site safety management system and method for general contracting of urban rail transit, which solves the five-party coordination problem of problem handling and tracking in the quality and safety management of urban rail transit construction projects. The specific content of the invention is as follows:

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Urban rail transit general contract site safety management system and method
  • Urban rail transit general contract site safety management system and method
  • Urban rail transit general contract site safety management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] Below in conjunction with the accompanying drawings of the present invention, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention. All other embodiments obtained under the premise of creative work belong to the protection scope of the present invention.

[0030] Such as figure 1 As shown, the system of the present invention includes a basic data module 1 , a problem deadline database module 2 , a problem processing module 3 , a timer module 4 , and a message pushing module 5 .

[0031] Basic data module 1, including problem category definition module 1.1, problem category definition module 1.2 and problem processing link definition module 1.3, used to define problem basic data;

[0032] Problem category definition module 1.1, used to define the problem category code, category name and corresponding maximum processing time;...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides an urban rail transit general contract site safety management system and method. The system comprises a basic data module, a problem deadline library module, an information input module, a problem processing module, a timer module and a message push module. The problem processing deadline is calculated according to the problem deadline library module, problem information is recorded in the problem processing module, whether problem processing is overtime or not is judged through comparison of the timer module, and finally problem processing information is pushed to the PC terminal and the mobile terminal through the message pushing module. According to the method, units at all levels can be supervised and urged to handle problems in time, the problems of mutual skin tearing and prevarication of the units when the problems occur in the quality safety management of the urban rail transit construction project are well solved, and the problem handling efficiency is improved.

Description

technical field [0001] The invention relates to the technical field of construction project quality and safety management, in particular to a system and method for on-site safety management of urban rail transit general contracting. Background technique [0002] During the construction of urban rail transit projects, there will be various quality and safety issues that need to be dealt with. The process includes problem grading, responsibility determination, coordination, processing, tracking, and closed-loop processes. Under the existing technical means, problem determination After being assigned to a certain unit, there is no effective means to track the handling, especially when the problem has been stagnant for a long time, it often needs to be manually identified and dealt with, which affects the efficiency of problem handling. Contents of the invention [0003] Aiming at the existing problems in the prior art, the present invention provides an on-site safety manageme...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/0631G06Q10/06395G06Q10/103G06Q50/08
Inventor 韩晓飞黄维江张静张颖衡王钦点汪鹏赵连连
Owner 江苏省城市轨道交通研究设计院股份有限公司