Project progress display device for constructional engineering management
A technology for construction engineering and display devices, which is applied to display devices, signs, instruments, etc., and can solve problems such as poor adaptability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0018] see Figure 1-Figure 4 , the engineering progress display device for construction project management, including a lifting mechanism and a folding mechanism arranged on the base 48, the lifting mechanism and the folding mechanism are connected by a connecting block 41, the folding mechanism includes a vertical plate 1, and a rotating shaft 21 is arranged on the outside of the vertical plate 1 , the both sides of vertical plate 1 are provided with rotating shaft 21, and rotating shaft is bar shape, and magnetic plate 22 is hinged on rotating shaft 21, and magnetic plate 22 is provided with two, is respectively rotatably connected on the rotating shaft 21, vertical plate 1 and the magnetic plate of both sides. Plate 22 is on the same level, which is convenient for display operation. Cavity 31 is provided in vertical plate 1, and sliding plate 32 is slidably connected to the inner wall of cavity 31. The inner wall of the cavity 31 slides up and down stably, the lower end of...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


