Heavy-load self-climbing construction device and climbing method thereof

A construction device and self-climbing technology, applied in the fields of formwork/formwork/work frame, on-site preparation of building components, construction, etc., can solve the problems of low efficiency, difficult quality control, and high tower height.

Active Publication Date: 2021-07-06
北京卓良工程有限公司
View PDF6 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

During the climbing process, the supporting beam needs to be disintegrated in the air, and then transported and installed to the predetermined floor, so as to realize the climbing of the tower crane. In the process of transporting the tower crane, other tower cranes need to be used for lifting, thereby reducing the utilization rate and construction efficiency of the tower crane. On the whole, it is conventional The unlucky climb has the disadvantages of large safety hazards, low efficiency, and difficult quality control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Heavy-load self-climbing construction device and climbing method thereof
  • Heavy-load self-climbing construction device and climbing method thereof
  • Heavy-load self-climbing construction device and climbing method thereof

Examples

Experimental program
Comparison scheme
Effect test

no. 1 Embodiment

[0054] see Figure 1 to Figure 8 , The first specific embodiment of the present invention provides a heavy-duty self-climbing construction device, which may be referred to as a construction device for short. In the construction scene, single or multiple construction devices can be arranged according to the structural form and stress state of the building, and each construction device is provided with at least one tower column 2, one support frame 1, and one jacking system 3. The first specific embodiment of the present invention is illustrated by taking a tower column 2 equipped with a support frame 1 and a jacking system 3 as an example.

[0055] The heavy-duty self-climbing construction device provided by the first specific embodiment of the present invention includes a support frame 1 , a tower column 2 , and a jacking system 3 . in:

[0056] The jacking system 3 includes a first jacking load-bearing beam 3-1 and a second jacking load-bearing beam 3-2, and is used for adj...

no. 2 Embodiment

[0107] The second specific embodiment of the present invention provides a heavy-duty self-climbing construction device. On the basis of the heavy-duty self-climbing construction device provided in the first specific embodiment, a support frame (i.e. the lower support frame 1") is added. .

[0108] Specific as Figure 9 As shown, in the heavy-duty self-climbing construction device provided by the second specific embodiment of the present invention, two support frames are arranged along the axial direction of the tower column 2, the support frame located above is the upper support frame 1', and the support frame located below is the upper support frame 1'. The frame is the lower support frame 1", and the upper support frame 1' is connected with the jacking system 3.

[0109] The climbing process of this heavy-duty self-climbing construction device can be found in Figure 9 .

no. 3 Embodiment

[0111] The third specific embodiment of the present invention provides a heavy-duty self-climbing construction device. On the basis of the heavy-duty self-climbing construction device provided by the second specific embodiment above, a support frame (that is, an intermediate support frame 1"' ) and one jacking system (i.e. the second jacking system 3"').

[0112] Specific as Figure 10 As shown, in the heavy-duty self-climbing construction device provided by the third specific embodiment of the present invention, three support frames are arranged along the axial direction of the tower column 2, which are respectively: the upper support frame 1' located above, and the lower support frame located below 1", and an intermediate support 1"' between them. Wherein, the upper support frame 1' is connected with the first jacking system 3', and the middle support frame 1"' is connected with the second jacking system 3"'.

[0113] The climbing process of this heavy-duty self-climbing c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a heavy-load self-climbing construction device and a climbing method thereof. The heavy-load self-climbing construction device and the climbing method thereof can realize mutual climbing of a tower column and a supporting frame, and avoid the problem of frequent transferring of supporting beams. The construction device comprises the supporting frame, the tower column and a jacking system. The jacking system comprises a first jacking bearing beam, a second jacking bearing beam and a driving device used for adjusting the distance between the first jacking bearing beam and the second jacking bearing beam, the first jacking bearing beam is provided with a first adjusting mechanism, and the second jacking bearing beam is provided with a second adjusting mechanism; the supporting frame is fixedly connected with the second jacking bearing beam and can be detachably connected with a building structure; the tower column is provided with a plurality of ladder stops in the vertical direction; the first adjusting mechanism can be connected with the ladder stops in a clamped mode when in a first working state, and the first adjusting mechanism is separated from the ladder stops when in a second working state; and the second adjusting mechanism can be connected with the ladder stops in a clamped mode when in a third working state, and the second adjusting mechanism is separated from the ladder stops when in a fourth working state.

Description

[0001] This application claims the priority of the Chinese patent application with the application number 202110238609.2 and the title of the invention "a heavy-duty self-climbing construction device and its climbing method" submitted to the China Patent Office on March 4, 2021, the entire content of which is incorporated by reference incorporated in this application. technical field [0002] The invention relates to the technical field of aerial work, in particular to a heavy-duty self-climbing construction device and a climbing method thereof. Background technique [0003] With the rapid development of society, in the field of building construction, especially in the construction process of super high-rise, bridge H-shaped tower, dam, etc., new technology and new equipment are gradually increasing, and the construction requirements are also gradually increasing. In order to meet the construction needs, More and more construction sites have started to use self-climbing form...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): E04G11/28E04G3/28
CPCE04G11/28E04G3/28E04G2003/286
Inventor 刘志坚常亚亚宁智刚吴仍辉要志东李学峰王忠华王兴彩
Owner 北京卓良工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products