Construction method for preventing leakage of large-area basement
A construction method and basement technology, which can be applied to artificial islands, water conservancy projects, underwater structures, etc., can solve the problem that the leakage cannot be repaired in time, the fixing position of the steel bar at the formwork connection structure is unreasonable, and the basement can be lowered. Safety and other issues, to ensure safety, improve the quality of anti-leakage construction, and facilitate the promotion and use of the effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0017] A construction method for anti-seepage of a large-area basement, which comprises the following steps:
[0018] Step 1: Formwork installation: choose the pouring formwork made of 60*80 square timber. During the construction of the exterior wall, the outer side of the exterior wall is assembled with a large formwork, and steel pipes are used for vertical and horizontal bidirectional fixation. Double-sided foam glue is used for fixing, and at the same time, the connecting iron hoop should be used for fixing at the position of the hanging formwork. In addition, when the butt bolts of the basement formwork are installed, a water stop ring should be welded in the middle of the butt bolts, and the water stop ring should be 4mm steel plate Manufacture, diameter 8cm, and set up the water stop ring at the wall thickness position, the water stop ring and the bolts are fully welded and sealed, and add wood between the water stop ring at both ends and the formwork on both sides, remo...
PUM
| Property | Measurement | Unit |
|---|---|---|
| Thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
Login to View More