An all-scrap steel and process technology, applied in the direction of electric furnace, process efficiency improvement, furnace, etc., can solve problems such as difficult hot charging of molten iron, difficult hot charging of electric furnace hot metal, difficulty in utilizing short-process energy consumption and emissions of electric furnace, etc., to achieve compression loading The effect of shortening the material time, speeding up the melting speed and improving the utilization rate of electric energy
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment 1
[0019] An electric furnace full scrap steel smelting process adopts a 100t top-loading ultra-high-power electric arc furnace, comprising:
[0020] Step 1: Configure the material package, the first package of scrap steel is loaded with 70t, and 3t of crushed material, 0.5t of anthracite, 6t of briquette, 18.5t of crushed material, 6t of heavy waste, 6t of crushed material, and briquette are added to the material package from bottom to top. 5t, crushed material 25t; the total amount of scrap in the second package is 48t, the material package is added from bottom to top with heavy waste 30t, crushed material 18t;
[0021] Step 2: molten steel smelting, add the first bag of scrap into the furnace, lower the electrode to start energizing, use 9-speed voltage and 6-speed current for arc starting, change the furnace wall gun to preheating mode, the main oxygen flow is 250Nm3 / h, natural gas The flow rate is 250m3 / h, and the epoxy flow rate is 250m3 / h. When the power consumption is 50k...
Embodiment 2
[0027] An electric furnace full scrap steel smelting process adopts a 100t top-loading ultra-high-power electric arc furnace, comprising:
[0028] Step 1: Configure the material package, the first package of scrap steel is loaded with 66t, and 2t of crushed material, 0.7t of anthracite, 5t of briquette, 18.3t of crushed material, 5t of heavy waste, 5t of crushed material, and briquette are added to the material package from bottom to top. 4t, crushed material 26t; the total amount of scrap steel in the second package is 52t, the material package is loaded with heavy waste from bottom to top, 32t, crushed material 20t;
[0029] Step 2: Smelting molten steel, adding the first bag of scrap into the furnace, lowering the electrode and starting to energize, using 9-speed voltage and 6-speed current for arc starting, changing the furnace wall gun to preheating mode, the main oxygen flow is 225Nm3 / h, natural gas The flow rate is 200m3 / h, and the epoxy flow rate is 225m3 / h. When the p...