Design resource replacement method for work plan stage

A technology for job planning and resource design, applied in the field of job scheduling and resource allocation in the process of product development, it can solve problems such as increased additional costs and long waiting time for jobs, achieve accurate judgment, reduce idle non-critical resources, and improve completion efficiency. effect on resource use efficiency

Active Publication Date: 2021-08-06
BEIJING INSTITUTE OF TECHNOLOGYGY
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004]Aiming at the multi-project competition for key resources in the process of job scheduling and resource allocation in the field of R&D and design, resulting in long waiting times for some jobs and serious idleness of non-critical bottleneck resources problem, the purpose of the present invention is to provide a design resource replacement method oriented to the operation planning stage, avoiding additional cost increases or operation delays caused by resource constraints, while reducing idle non-critical resources in the process, and improving the efficiency and resources of R&D operations. Benefits

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Design resource replacement method for work plan stage
  • Design resource replacement method for work plan stage
  • Design resource replacement method for work plan stage

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0067] The present invention will be described in detail below with reference to the drawings and embodiments. At the same time, the technical problems and beneficial effects solved by the technical solution of the present invention are also described. It should be pointed out that the described embodiments are only intended to facilitate the understanding of the present invention, and have no limiting effect on it.

[0068] This method is applied to the field of job scheduling and resource allocation in the product development and design process. In order to verify the feasibility of the method, a certain train R&D department is selected as an example. There are currently five jobs to be completed in the R&D department W 1 , W 2 , W 3 , W 4 , W 5 , there are ten design resources R in the department 1 , R 2 , R 3 , R 4 , R 5 , R 6 , R 7 , R 8 , R 9 , R 10 .

[0069] Such as figure 1 As shown, this embodiment discloses a design resource replacement method oriente...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a design resource replacement method for a work plan stage, and belongs to the field of job scheduling and resource configuration. Aiming at the problem that smooth operation is restricted by key resource competition and non-key resource idleness in the product design process, the resource quantity and the time index are comprehensively considered to evaluate the resource tension degree, key bottleneck resources are positioned, and target resources with replacement requirements are obtained; the replaceable resources of the target resources are quickly and comprehensively screened in the resource full set through the resource multi-attribute indexes; and based on the priority sequence, a replacement scheme of a target resource is determined according to a similarity maximum principle and a productivity satisfaction principle, and an initial resource use plan is updated, so that each work can obtain resources capable of meeting requirements within a specified time, resource restriction is effectively relieved, non-key resource idleness is reduced, and the work completion efficiency and the resource use benefit are improved. The method is applicable to the fields of research and development work scheduling and resource allocation of subjects such as machinery, chemical engineering and materials.

Description

technical field [0001] The invention relates to a design resource replacement method oriented to the operation planning stage, which belongs to the field of operation scheduling and resource allocation in the product research and development process. Background technique [0002] In recent years, with the vigorous development of computer and Internet technology, the update and iteration speed of various products in various industries has been significantly accelerated, which has put forward higher requirements for the R&D capabilities of enterprises. For the R&D department of an enterprise, how to rationally optimize the allocation of design resources can not only shorten the R&D cycle as much as possible, complete more R&D operations per unit time, but also make full use of the design resources of the enterprise and improve the efficiency of the enterprise. become an urgent problem to be solved. [0003] In the field of job scheduling and resource allocation, traditional r...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06
CPCG06Q10/06312G06Q10/06315G06Q10/0639
Inventor 张发平孙嘉铖王蕊蕊敬石开阎艳
Owner BEIJING INSTITUTE OF TECHNOLOGYGY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products