Treatment device and treatment method for dredging sludge
A technology for dredging silt and treatment equipment, which is applied in the field of dredging silt treatment equipment, which can solve the problems of permanent soil damage, water pollution, resource waste, etc., and achieve the effects of increasing soil cracks, reducing production costs, and facilitating discharge
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] like Figure 1-Figure 3As shown, the present embodiment provides a processing device 100 for dredging sludge, including a barrel 2, a pressurizing pipe group 6, a drainage pipe group 5, an inflation device 1 and a vacuuming device 4, and each surface of the barrel 2 is sealed. The barrel 2 is used to fill the sludge to form a sealed space, which is convenient for vacuuming and pressurization operations, so that the water in the sludge can be discharged to achieve consolidation. At the same time, the barrel 2 is used to replace the sand layer to improve the overall strength. , compared with the non-recyclability of the sand layer, the barrel 2 can be recycled, thereby avoiding waste of resources and reducing production costs. One end of the group 6 is connected to the inflatable device 1. The inflatable device 1 is used to inflate and pressurize the barrel 2 through the pressurized pipe group 6. The pore water is discharged, thereby improving the sludge consolidation ef...
Embodiment 2
[0047] This embodiment provides a method for processing dredged sludge, using the processing device 100 for dredging sludge in Embodiment 1, including the following steps:
[0048] S1. Preliminary drainage: turn on the vacuuming equipment 4 and keep the inflatable equipment 1 closed, so that the pore water in the barrel 2 enters the gas-water separation element 3, observe the flow rate of the pore water, and close the vacuuming equipment 4 when the flow rate becomes slow. , let the sludge in the barrel 1 stand still;
[0049] S2. Deep drainage: After 9 to 11 hours, turn on the vacuuming equipment 4 again, preferably, the resting time is 10 hours; and intermittently open or close the inflatable equipment 1, more preferably, the inflatable equipment 1 is turned on for 1.5 hours per day , so as to avoid too much air charging when the pressurization time is too long, reduce the vacuum environment of the soil, weaken the pressurization effect, and also avoid that when the pressuriz...