Tunnel excavation supporting trolley and construction method and operation method thereof
A technology for tunnel excavation and support of trolleys, which is applied in tunnels, earthwork drilling, bridge forms, etc., can solve the problems of complicated construction operations and complex trolley structures, and achieves improved construction efficiency, obvious technical advantages, and random adjustment. The effect of construction location
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] The embodiment of the present application provides a construction method for a tunnel excavation support trolley, including the steps of installing the track 6 and the installation of the construction platform 2. Specifically, the steps include:
[0032] Installation of track 6: install multiple bottom beams 9, install track 6 on the top surface of each bottom beam 9, and bolt connection beam 10 between two adjacent bottom beams 9;
[0033] Installation of construction platform 2: install rail clamp 8 at the bottom of base plate 5, fix base plate 5 on rail 6, set hydraulic telescopic column 4 on the top surface of base plate 5, install construction platform 2 on the top of hydraulic telescopic column 4, construction platform 2 move along the length direction of the bottom beam 9 through the track 6;
[0034]Installation of separate lifting trestle 12: arrange a separate lifting trestle 12 at both ends of the contact beam 10, each separate lifting trestle 12 includes app...
Embodiment 2
[0046] This application provides an operation method for the construction method of the tunnel excavation and support trolley, wherein the construction method of the tunnel excavation and support trolley is as described in Embodiment 1, and no redundant description is made here. The present embodiment provides The method of operation includes the following steps:
[0047] Construction platform 2 operation: drive the construction platform 2 to move to the construction section through the walking system 7, control the height of the construction platform 2 through the hydraulic telescopic column 4, and control the movement of the rail clamp 8 in the track 6 to drive the distance between adjacent construction platforms 2 ;
[0048] Operation of the separated lifting trestle 12: When vehicles pass by in the construction section, the two separated lifting trestles 12 are moved to the two ends of the connecting beam 10 respectively, and the approach bridge 13 is lowered to the tunnel...
Embodiment 3
[0052] The embodiment of the present application provides a construction method of a tunnel excavation supporting trolley, including a construction platform 2 and a separated lifting trestle 12, and the construction platform 2 and the separated lifting trestle can be excavated according to the tunnel described in the first embodiment The construction method of the support trolley is obtained, and the operation method of the tunnel excavation support trolley provided in this embodiment can be operated through the operation method provided in the second embodiment to meet the tunnel driving requirements during the tunnel support construction in the construction section , and does not limit the ride height.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com