Project cost quota dynamic management platform based on big data
A technology for engineering cost and dynamic management, applied in data processing applications, electrical digital data processing, special data processing applications, etc., can solve the problems of lagging technology progress, difficulty in cost personnel, and differences
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] Such as figure 1 As shown, a big data-based engineering cost quota dynamic management platform in this embodiment includes a server, a management terminal, a user terminal and an expert terminal.
[0042] The server includes a database, a query module, a quota feedback module, a task management module, an answer module, a material hangar management module, an expert application module, an expert management module, a quota release module, a quota application module and a quota conversion module.
[0043] Quotas are stored in the database. In this embodiment, the quotas include project pricing quotas, cost quotas, and construction machine shift quotas. In other embodiments, construction-related materials such as concrete and mortar ratio tables may also be included.
[0044] The material hangar management module is used to receive the data of the material machine uploaded by the management terminal and store it in the database; the data of the material machine includes ...
Embodiment 2
[0056] The difference between this embodiment and Embodiment 1 is that in this embodiment, the quota feedback module is also used to determine whether the number of feedback words in the received feedback and evaluation information exceeds the first threshold, and if it exceeds the first threshold, mark it as valid feedback.
[0057] The answer module is also used to judge whether the acquisition time of the answer information corresponding to the valid feedback exceeds the second threshold, and if so, mark it as a valid answer.
[0058] After the expert application module receives the client's application for entering the expert database, it is also used to judge whether the effective answer obtained by the client exceeds the third threshold, and if so, marks the application for entering the expert database as a high-priority application.
[0059] The expert application module is also used to record each feedback time of each management terminal. Based on each feedback time o...
Embodiment 3
[0065] The difference between this embodiment and Embodiment 2 is that in this embodiment, the expert application module is also used to send several applications including high-priority applications to enter the expert database to the two selected management terminals.
[0066] The two management terminals are also used for information exchange. Firstly, the management terminal that checks the application in the expert database does not display the mark of high-priority application, and then checks the management terminal of the expert database application to display the mark of high-priority application.
[0067] It can effectively improve the efficiency of review, and at the same time prevent high-priority applications from being published in advance.
PUM