Unlock instant, AI-driven research and patent intelligence for your innovation.

Project cost quota dynamic management platform based on big data

A technology for engineering cost and dynamic management, applied in data processing applications, electrical digital data processing, special data processing applications, etc., can solve the problems of lagging technology progress, difficulty in cost personnel, and differences

Pending Publication Date: 2021-10-29
CHONGQING COLLEGE OF ELECTRONICS ENG
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, since the release of the quota often lags behind the progress of technology, there may be differences between the quota and the actual construction
However, the channel through which the cost clerk obtains the quota is not necessarily the official release channel, which makes it difficult for the cost clerk to give timely feedback on the problems existing in the quota, which is not conducive to the supplement and update of the quota

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project cost quota dynamic management platform based on big data

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0041] Such as figure 1 As shown, a big data-based engineering cost quota dynamic management platform in this embodiment includes a server, a management terminal, a user terminal and an expert terminal.

[0042] The server includes a database, a query module, a quota feedback module, a task management module, an answer module, a material hangar management module, an expert application module, an expert management module, a quota release module, a quota application module and a quota conversion module.

[0043] Quotas are stored in the database. In this embodiment, the quotas include project pricing quotas, cost quotas, and construction machine shift quotas. In other embodiments, construction-related materials such as concrete and mortar ratio tables may also be included.

[0044] The material hangar management module is used to receive the data of the material machine uploaded by the management terminal and store it in the database; the data of the material machine includes ...

Embodiment 2

[0056] The difference between this embodiment and Embodiment 1 is that in this embodiment, the quota feedback module is also used to determine whether the number of feedback words in the received feedback and evaluation information exceeds the first threshold, and if it exceeds the first threshold, mark it as valid feedback.

[0057] The answer module is also used to judge whether the acquisition time of the answer information corresponding to the valid feedback exceeds the second threshold, and if so, mark it as a valid answer.

[0058] After the expert application module receives the client's application for entering the expert database, it is also used to judge whether the effective answer obtained by the client exceeds the third threshold, and if so, marks the application for entering the expert database as a high-priority application.

[0059] The expert application module is also used to record each feedback time of each management terminal. Based on each feedback time o...

Embodiment 3

[0065] The difference between this embodiment and Embodiment 2 is that in this embodiment, the expert application module is also used to send several applications including high-priority applications to enter the expert database to the two selected management terminals.

[0066] The two management terminals are also used for information exchange. Firstly, the management terminal that checks the application in the expert database does not display the mark of high-priority application, and then checks the management terminal of the expert database application to display the mark of high-priority application.

[0067] It can effectively improve the efficiency of review, and at the same time prevent high-priority applications from being published in advance.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to the technical field of project cost, and particularly discloses a project cost quota dynamic management platform based on big data, which comprises a server, a user side and an expert side; the server comprises a database, a query module, a quota feedback module, a task management module and an answering module; quotas are stored in the database; the query module is used for receiving a quota query request of a user side, calling the quota from the database based on the quota query request and sending the quota to the user side; the quota feedback module is used for receiving feedback and evaluation information of the user side; the task management module is used for distributing experts according to feedback and evaluation information; and the answering module is used for pushing the feedback and evaluation information to an expert end of a corresponding expert, acquiring answering information from the expert end and pushing the answering information to a corresponding user end. By adopting the technical scheme of the invention, the user can conveniently feed back opinions.

Description

technical field [0001] The invention relates to the technical field of engineering cost, in particular to a dynamic management platform for engineering cost quota based on big data. Background technique [0002] The project quota refers to the quantity standard of the labor, materials, construction machinery and tools, construction period days and related rates consumed to complete the qualified building installation project with the specified measurement unit under normal construction conditions. [0003] At present, cost clerks usually find the quota by themselves, and then calculate the project budget based on the quota. However, since the release of the quota often lags behind the progress of technology, there may be differences between the quota and the actual construction. However, the channel through which the cost clerk obtains the quota is not necessarily the official release channel, which makes it difficult for the cost clerk to give timely feedback on the proble...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06F16/2455G06Q10/10G06Q50/08
CPCG06F16/2455G06Q10/103G06Q50/08