Reverse construction method pile-repairing construction method for pipeline influence position
A construction method and reverse method technology, applied in excavation, infrastructure engineering, construction, etc., can solve problems such as collapse, abnormal construction, instability, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The following is attached Figure 1-5 The present invention is described in further detail.
[0036] The embodiment of the present invention discloses a construction method for pile repairing by the reverse method at the affected position of the pipeline. refer to figure 1 , a method for filling piles with the reverse method at the affected position of the pipeline comprises the following steps:
[0037] S1: Construction preparation: Transport hammer device 7, hand-held impact drill and other equipment to the construction site.
[0038] S2: Excavation in layers: When excavating the foundation pit, reserve 3m of core soil on both sides of the retaining pile 1 near the leakage pile 10, and then divide the leakage pile 10 by mechanical and manual methods according to the geological conditions. Layer excavation, the excavation thickness of each layer of the clay layer is 2m, when excavating to the sand layer, the thickness of each layer of excavation is 0.5m.
[0039] S...