High arch dam vacuum full pipe chute and belt conveyor combined planning and construction method

A construction method and belt conveyor technology, applied in infrastructure engineering, construction, etc., can solve problems such as the inability to guarantee the quality of concrete delivery, low strength of roller compacted concrete pouring, difficulties in concrete transportation and warehousing, etc., and achieve good operating performance and shorten The construction period and the effect of strong overload capacity

Pending Publication Date: 2021-11-19
SINOHYDRO ENG BUREAU 4
View PDF2 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] Most of the existing RCC arch dams use the traditional vacuum full-pipe chute for concrete transportation and warehousing construction; however, some 100-meter-level RCC high arch dams are located in narrow and steep V-shaped and U-shaped valleys. The slopes on both sides of the dam are steep and there is no horse track, which brings great difficulties to the transportation and warehousing of concrete
As a result, the quality of concrete delivery cannot be guaranteed, the separation of concrete aggregates occurs, the pouring strength of roller compacted concrete is low, the construction is difficult, the risk factor is high, and the construction period is long.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • High arch dam vacuum full pipe chute and belt conveyor combined planning and construction method
  • High arch dam vacuum full pipe chute and belt conveyor combined planning and construction method
  • High arch dam vacuum full pipe chute and belt conveyor combined planning and construction method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0046] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings of the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

[0047] The invention relates to a high arch dam vacuum full pipe chute and belt conveyor combination planning and construction method, the high arch dam vacuum full pipe chute and belt conveyor combination planning and construction method includes Pipe chute construction method.

[0048] At present, the 100-meter-level roller compacted concrete high arch dam under construction or has been built in China is located in the "V" and "U" shaped valley. Take the San...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a high arch dam vacuum full pipe chute and belt conveyor combined planning and construction method. The high arch dam vacuum full pipe chute and belt conveyor combined planning and construction method comprises a vacuum full pipe chute and the belt conveyor combined planning method and vacuum full pipe chute construction method. The high arch dam vacuum full pipe chute and belt conveyor combined planning and construction method has the advantages that the engineering progress is fast, the construction method is simple, the overload capacity is high, the safety degree is high, the operation performance is good, and damming materials are saved; the problem of transportation and warehousing bottleneck of concrete can be effectively solved, the pouring strength of roller compacted concrete is improved, and the construction difficulty and the risk coefficient are reduced, the construction period is shortened, and engineering measures are relatively few while the concrete conveying quality is ensured and the effect of rapid damming of the roller compacted concrete is achieved; and the high arch dam vacuum full pipe chute and belt conveyor combined planning and construction method is a new way for effectively realizing quick roller compacted concrete damming of the high arch dam, and is suitable for the field of roller compacted concrete industries of hydropower stations and water conservancy projects at home and abroad.

Description

technical field [0001] The invention relates to the technical field of water conservancy engineering, in particular to a combined planning and construction method of a high arch dam vacuum full pipe chute and a belt conveyor. Background technique [0002] Roller compacted concrete arch dam has the advantages of fast project progress, simple construction method, strong overload capacity, high safety, good operation performance, and low dam construction materials, so it is widely used in the field of water conservancy and hydropower engineering. The crest elevation, dam bottom elevation, maximum dam height, dam crest width, arch crown dam bottom thickness, and dam crest upstream arc length can all be designed to be relatively large for RCC arch dams. The dam flood discharge structure is composed of the dam body flood discharge surface hole, the flood discharge bottom hole and downstream energy dissipation and anti-scour buildings, among which the barrage dam, pumped hydropower...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): E02D15/02
CPCE02D15/02E02D2250/0023
Inventor 刘红玉史广生巨敬良张俊宏张鹏李国锋万芳羽吴小会张军李青李占生郑艳霞巨占祥李亮
Owner SINOHYDRO ENG BUREAU 4
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products