Unlock instant, AI-driven research and patent intelligence for your innovation.

Fireproof high-speed leaky cable clamp

A fire-proof and fixture technology, applied in fire rescue, electrical components, etc., can solve problems such as vibration, leaky cable fixture damage, breakage, etc., to achieve the effect of easy installation and use, and prevent vibration

Pending Publication Date: 2021-11-23
江苏中伟业通讯设备有限公司
View PDF0 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

In traditional subway line tunnel engineering, the leaky cable installation fixture is directly nailed to the wall of the civil structure through the internal expansion bolt. Due to the environment in the tunnel, when a car passes by, the wind and vibration will cause damage to the leaky cable fixture; currently In order to fix the leaky cable well, the leaky cable fixture is also constantly changing, but as the speed of the bullet train / high-speed rail increases, the speed when passing through the tunnel can reach 350 kilometers per hour. The previous design requirements of the leaky cable fixture can only Satisfy the application below 200 kilometers per hour. Once the speed exceeds this speed, problems such as vibration and fracture will occur, which cannot meet the use of higher speeds

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Fireproof high-speed leaky cable clamp
  • Fireproof high-speed leaky cable clamp
  • Fireproof high-speed leaky cable clamp

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0026] Refer to attached Figure 1-9 , a fireproof high-speed leaky cable fixture, which includes a base 1, a left fixture 2, a right fixture 3 and a middle fixture 4, and the left and right fixtures 2 and 3 are respectively designed and installed on the left and right sides of the base 1, The middle fixture 4 is installed on the base 1 and the middle fixture 4 is located between the left fixture 2 and the right fixture 3. The middle fixture 4 includes a support seat 41, a press buckle 42, a bolt 43, a nut 44, an expansion Anchor 45, fixed column 46 and screw 47, one end of press buckle 42 is connected with the rotation of one end of holder 41, the other end of press button 42 and the other end of holder 41 all design semicircular plate 48, two semicircular plates 48 Cooperate up and down, have fixing hole respectively in the middle of two semicircular plates 48, after bolt 43 passes through two fixing holes, screw on bolt 43 and lock two semicircular plates 48 by nut 44 again...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a fireproof high-speed leaky cable clamp which comprises a base, a left clamp, a right clamp and a middle clamp, the middle clamp comprises a supporting seat, a pressing buckle, a bolt, a nut, an expansion anchor nail, a fixing column and a screw, one end of the pressing buckle is rotatably connected with one end of the supporting seat, and the other end of the pressing buckle and the other end of the supporting seat are each provided with a semicircular plate. The two semicircular plates are matched up and down, fixing holes are formed in the middles of the two semicircular plates respectively, and after a bolt penetrates through the two fixing holes, the two semicircular plates are locked by screwing a nut on the bolt; and the middle clamp is made of stainless steel materials. The clamp has the advantages that three clamps are designed into a group, the left auxiliary clamp and the right auxiliary clamp are arranged, the middle clamp is stainless steel metal, and the structural design can meet the requirements of tunnels where bullet trains / high-speed rails pass through, and the current market requirements are met. The left clamp, the right clamp and the base are made of fireproof nylon 66, so that the fixture has a fireproof function, and the middle fixture is made of stainless steel and also has a fireproof function.

Description

technical field [0001] The invention relates to the technical field of leaky cable clamps, in particular to a fireproof high-speed leaky cable clamp. Background technique [0002] Leaky cable is the abbreviation of leaky coaxial cable (Leaky Coaxial Cable), usually referred to as leaky cable or leaky cable. Its structure is basically the same as that of ordinary coaxial cable. The conductor consists of three parts. In the traditional subway line tunnel engineering, the leaky cable installation fixture is directly nailed to the wall of the civil structure through the internal expansion bolt. Due to the environment in the tunnel, when a car passes by, the wind and vibration will cause damage to the leaky cable fixture; currently In order to fix the leaky cable well, the leaky cable fixture is also constantly changing, but as the speed of the bullet train / high-speed rail increases, the speed when passing through the tunnel can reach 350 kilometers per hour. The previous design...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02G3/02H02G3/32A62C3/16
Inventor 陈跃东
Owner 江苏中伟业通讯设备有限公司