One-key sequential control operation and maintenance method and system, computer device and medium thereof

An operation and maintenance system and operation and maintenance technology, applied in the field of substation operation and maintenance, can solve the problems of low efficiency and low security of one-key sequential control operation and maintenance, and achieve deepening the application of one-key sequential control technology, ensuring stability and safety , the effect of improving work efficiency

Active Publication Date: 2021-11-23
STATE GRID HUBEI ELECTRIC POWER CO LTD MAINTENANCE CO +1
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The purpose of the embodiment of the present application is to propose a one-key sequential control operation and maintenance method, device, computer equipment and its media, so as to solve the problems of low operation and maintenance efficiency and low security of the existing one-key sequential control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • One-key sequential control operation and maintenance method and system, computer device and medium thereof
  • One-key sequential control operation and maintenance method and system, computer device and medium thereof
  • One-key sequential control operation and maintenance method and system, computer device and medium thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by those skilled in the technical field of the application; the terms used herein in the description of the application are only to describe specific embodiments The purpose is not to limit the present application; the terms "comprising" and "having" and any variations thereof in the specification and claims of the present application and the description of the above drawings are intended to cover non-exclusive inclusion. The terms "first", "second" and the like in the description and claims of the present application or the above drawings are used to distinguish different objects, rather than to describe a specific order.

[0025] Reference herein to an "embodiment" means that a particular feature, structure, or characteristic described in connection with the embodiment can be included in at least one embodiment of the present application. The occurrenc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The embodiment of the invention belongs to the technical field of substation operation and maintenance, and relates to a one-key sequential control operation and maintenance method and device, a computer device and a medium thereof, wherein the method comprises the steps of executing a target preview operation on a target device; enabling the target preview operation to pass through the first anti-misoperation locking verification of a sequential control host and the second anti-misoperation locking verification of an anti-misoperation host, and when the first anti-misoperation locking verification and the second anti-misoperation locking verification both pass verification, executing an one-key sequential control operation according to the target preview operation and the state information of the target device, so that the safety problem caused by the misoperation and omission in the one-key sequential control operation is avoided through target preview operation and double verification, the stability and safety of the one-key sequential control operation are guaranteed, and meanwhile, the accuracy of the one-key sequential control operation is guaranteed. Meanwhile, the detection and verification in the operation process are executed through the sequential control host and the anti-misoperation host, so that the working efficiency of the substation operation and maintenance is improved, the one-key sequential control technology application is deepened, and the safe and efficient operation of a power grid is guaranteed.

Description

technical field [0001] The present application relates to the technical field of operation and maintenance of substations, in particular to a one-button sequential control operation and maintenance method, device, computer equipment and media thereof. Background technique [0002] In recent years, the power grid construction has experienced rapid development, the number of substations has continued to increase, and the production tasks of front-line personnel have become increasingly heavy. Switching operations are performed manually. Work such as ticket writing, auditing, simulation, and five-proof verification is required before operation. The process is complex and repetitive. Large workload, many ineffective labor, low operating efficiency, consume a lot of manpower and material resources, aggravate the number of personnel and structural contradictions, and it is difficult to adapt to the development needs of the current power grid. [0003] One-button sequential control...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): H02J13/00
CPCH02J13/00001H02J13/00002H02J13/00016H02J13/00026H02J13/00032H02J13/00034Y02E60/00Y04S10/16Y04S40/124Y04S40/126
Inventor 刘杜王勇杰邓科余强李煜磊李旭东李挺何宇雄刘颖彤翁一潇刘磊余旸毛雨亭汪铭洪叶柳军曹安瑛彭涛柳明
Owner STATE GRID HUBEI ELECTRIC POWER CO LTD MAINTENANCE CO