A sprocket and tooling technology, which is applied to gear teeth manufacturing devices, belts/chains/gears, gear teeth, etc., can solve problems such as long time for tooling replacement, clamping and alignment, unfavorable organization of production, and small batches in a single batch. To achieve the effect of ensuring reliability, facilitating automatic processing, and ensuring normal processing
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0041] see Figure 1-4 , a sprocket milling complete set of tooling, which includes a tooling body 1, the top of the tooling body 1 is supported with a positioning sleeve 2, and the top of the tooling body 1 is fixed with a pressure plate structure for pressing the positioning sleeve 2; The positioning sleeve 2 is used to set and fix the sprocket 3 to be processed; the sprocket 3 is pressed and fixed on the positioning sleeve 2 through the gland structure. The tool set with the above structure can be used in the processing of the sprocket 3 to reliably fix the sprocket 3, and then cooperate with the machine tool to complete the processing of the sprocket. And just can realize the installation location of the sprocket wheel of different models by changing the positioning sleeve 2 of different models.
[0042] Further, the pressure plate structure includes a plurality of first stud bolts 10 evenly distributed on the top of the tooling body 1, and a pressure plate 8 is positione...
Embodiment 2
[0054] A sprocket milling tool set for sprocket clamping method, comprising the following steps:
[0055] Step 1: First, select the matching positioning sleeve 2 according to the size and model of the sprocket 3 to be processed;
[0056] Step 2: Set the positioning sleeve 2 on the tooling body 1 through its center hole;
[0057] Step 3: Install the pressure plate 8 on the top of the tool body 1, and press and fix the positioning sleeve 2 through the pressure plate 8;
[0058] Step 4: Install the sprocket 3 on the positioning sleeve 2;
[0059] Step 5: Fix the gland 4 on the top of the sprocket 3, and press and fix the gland 4 on the top of the sprocket 3 through the second nut 6, so as to realize the fixing of the sprocket 3;
[0060] Step 6: Start the machine tool to process the sprocket 3;
[0061] Step 7: After the processing of the same batch of sprockets 3 is completed, remove the positioning sleeve 2, and repeat steps 1 to 6 to complete the processing of the next batc...