Roadway arrangement method for reserving small coal pillars between stope faces
A technology for mining working face and roadway layout, applied in mining equipment, tunnels, surface mining, etc., can solve problems such as damage, inability to provide mining services at the next working face, and increase coal and gas outbursts.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0037] Embodiments of the invention are described in detail below, examples of which are illustrated in the accompanying drawings. The embodiments described below by referring to the figures are exemplary and are intended to explain the present invention and should not be construed as limiting the present invention.
[0038] Such as Figure 1 to Figure 4 As shown, the roadway layout method (hereinafter referred to as the roadway layout method) of leaving small coal pillars between the mining face of the embodiment of the present invention comprises the following steps:
[0039] S1: Establish a separation line 9 that divides the first working face 1 into a first segment 11 and a second segment 12 along the mining direction, and divides the second working face 2 into a third segment 21 and a fourth segment 22 .
[0040] Specifically, such as figure 1 As shown, the mining area can be arranged on one side of the main road 8, and multiple working faces can be divided in the minin...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


