Productivity recovery method for an asphalt-blocked gravel-filled sand control well
A technology for gravel packing and well productivity, which is applied in chemical instruments and methods, earthwork drilling, wellbore flushing, etc. It can solve the problems of slow production recovery and long soaking time, and achieve the effect of restoring productivity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] This pair of embodiments provides a method for recovering productivity of a gravel-packed sand control well blocked by asphalt. The method is used to recover the productivity of a gravel-packed sand control well blocked by asphalt in an oilfield in Iraq. The method includes:
[0043] Step 1: Simultaneously inject diesel oil and xylene with a volume ratio of 2:1 into the gravel-packed sand control well blocked by bitumen, and backwash the well after soaking for 2 days; wherein, the total volume of diesel oil and xylene injected in this step is the annulus 2 times the volume of the inner quartz belt;
[0044] Step 2: Then inject diesel oil and xylene with a volume ratio of 1:2 into the gravel-packed sand control well blocked by asphalt, and backwash the well after soaking for 5 days; wherein, the total volume of diesel oil and xylene injected in this step is ring 4.8 times the volume of the quartz belt in the hollow;
[0045]Step 3: Inject diesel oil and xylene with a vo...
experiment example
[0051] Indoor simulation experiment
[0052] Prepare 6 samples of formation asphalt plugging, each of which is prepared as follows: 1 kg of asphalt and 2 kg of clay are fully mixed at 60 degrees for 3 days to obtain a sample of formation asphalt plugging;
[0053] The 6 samples of stratum asphalt plugging were subjected to flushing experiment, the experimental conditions and process: flushing temperature 60 degrees, pressure 2MPa, 6 samples of stratum asphalt plugging with diesel oil and xylene volume ratio of 3:1, 2:1, 1:1 , 1:2, 1:3 cleaning solution for continuous cleaning, and test the cleaning material every 2 hours;
[0054] The results are shown in Table 1.
[0055] Table 1
[0056]
[0057]
[0058] It can be seen from Table 1 that when the volume ratio of diesel oil to xylene is 1:2, the amount of clay washed out can be significantly increased; while other volume ratios of diesel oil mixed with xylene can hardly wash out clay.
[0059] The above-mentioned die...