Fireproof ultra-low energy consumption enclosure system
A technology with ultra-low energy consumption, applied in fire prevention, building components, building insulation materials, etc., can solve the problems of not meeting the thermal insulation performance of the enclosure structure, the complex structure of the enclosure system, and unfavorable wall insulation. Fast, conducive to wall insulation, and the effect of preventing cold bridges
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0040] A fireproof ultra-low energy enclosure system, such as figure 1 - Figure 6 As shown, it includes: composite thermal insulation wallboard and steel keel 2 and connecting structure; Connection and sealing, the horizontal connection structure is suitable for connecting and sealing between the left and right adjacent composite thermal insulation wall panels; the installation part 1 is installed on the steel keel 2, and the composite thermal insulation wall panel is plugged with the installation part 1 to connect multiple The composite thermal insulation wallboard is installed on the steel keel 2.
[0041] Compared with the existing curtain wall enclosure structure, the fireproof and ultra-low energy consumption enclosure system of the present invention combines the wall body and the thermal insulation system to form a composite thermal insulation wallboard, and directly integrates the composite thermal insulation wallboard during construction. The wall panel can be insta...
Embodiment 2
[0049] The fireproof ultra-low energy consumption enclosure system of this embodiment further defines the tongue-and-groove component on the basis of Embodiment 1.
[0050] Such as figure 1 - Figure 5 As shown, the groove-and-groove assembly includes: a first prefabricated part 3 and a second prefabricated part 8 arranged on opposite sides of the composite layer 26, and the transverse seam connection structure includes an elastic part; both ends of the first prefabricated part 3 are arranged on Between the flanging 25 of the layer and the composite layer 26, and connected with the flanging 25 of the decorative layer.
[0051] The first prefabricated part 3 is used in conjunction with the mounting part 1, and it is connected with the mounting part 1 through a first connection structure. The first connection structure includes a first wedge-shaped groove 4 and a first wedge-shaped protrusion 5. The first wedge-shaped groove 4 is arranged on the installation On the component 1...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


