A technology for weak foundations and construction methods, which is applied in the fields of infrastructure engineering, soil protection, construction, etc., can solve the problems of long construction period and large pile of earth volume, etc., and achieve the effect of increasing strength and coagulation speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] In order to make the purpose, technical solutions and beneficial effects of the present invention clearer, the preferred embodiments of the present invention will be described in detail below, so as to facilitate the understanding of the skilled person.
[0032] The vacuum surcharge preloading construction method for coastal weak foundation treatment includes the following steps:
[0033] (1) Pouring mud seal wall
[0034] Measurement stakeout
[0035] Use RTK to stake out a midpoint of the sealing wall every 50m, and release the center point of the pile through the pull wire according to the released control point.
[0036] position
[0037] Draw the pile position map of the sealing wall according to the construction drawing, and use bamboo sticks or drainage board cores to determine the pile position every 50cm according to the pile position map. The positioning deviation should be controlled within the range of ±50mm, and the verticality of the pile pipe should...