First-insertion-method pile-column integrated structure and construction method thereof

A pile and column slab technology, which is applied in the integrated structure of the first insertion method and its construction field, can solve the problems of difficult transportation, difficult control of the combination effect of concrete and surrounding steel plates, etc., and achieve good integrity and easy control of construction quality , The effect of reducing the risk of damage

Pending Publication Date: 2022-04-05
CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to overcome the defects existing in the existing technology, we now provide a pile-column integrated structure and its construction method by the first-insertion method to solve the difficulty in transportation of the pile-column integrated structure by the traditional post-insertion method and the problems of the inner and outer concrete of the steel pipe column and the surrounding steel plates. Combination effects are difficult to control

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • First-insertion-method pile-column integrated structure and construction method thereof
  • First-insertion-method pile-column integrated structure and construction method thereof
  • First-insertion-method pile-column integrated structure and construction method thereof

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0036] The application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain related inventions, rather than to limit the invention. It should also be noted that, for ease of description, only parts related to the invention are shown in the drawings.

[0037] It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and embodiments.

[0038] refer to Figure 1 to Figure 7 As shown, the present invention provides an integrated pile-column structure of the first-insertion method, including: concrete support pile 1, steel pipe column 2, multiple shear rings 3, reinforcement assembly 4, anti-surge device 5 and core concrete.

[00...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a pre-insertion method pile-column integrated structure and a construction method thereof.A steel pipe column of the structure is in an opening form, a shear ring is arranged outside the steel pipe column, then the steel pipe column is easier and more convenient to machine and transport, and compared with a traditional stud method, the damage risk of the steel pipe column is reduced; the concrete of the concrete supporting pile is prevented from flowing back upwards to the exterior of a column body of the steel pipe column, the concrete of the concrete supporting pile is pressed through an anti-gushing device arranged outside the steel pipe column, and core concrete in the steel pipe column is poured to the top of the steel pipe column at a time in the steel pipe column. The concrete of the concrete supporting pile and the core concrete in the steel pipe column can be integrally poured, the pouring integrity is good, and the construction quality is easy to control. The method solves the problems that a pile-column integrated structure is difficult to transport and the combination effect of concrete inside and outside the steel pipe column and surrounding steel plates is difficult to control in a traditional post-insertion method process.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a pile-column integrated structure and a construction method thereof. Background technique [0002] Pile-column integrated construction, as a common form of top-down method, is applied in the construction of engineering piles and superstructure columns constructed by top-down method, in order to save construction period or other purposes. The common upside-down construction method adopts the post-insertion process for the intermediate piles, using tool columns to connect long steel pipes, the bottom of the steel pipes is closed with conical steel plates, and the walls of the steel pipe columns are installed with studs, which puts forward higher requirements for the transportation and processing of steel pipe columns . The post-insertion method also has higher requirements on the retarding time of the concrete. At the same time, the lower end of the steel pipe is co...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E02D5/38E02D29/045E02D15/04
Inventor 张子鹤王宜彬崔瑞国张志平杨先军王国涛陈颂杨晨黎映呈王凯峰贾红学谢铭许本盈郑春峰陈嵩阳
Owner CHINA CONSTR EIGHT ENG DIV CORP LTD