First-insertion-method pile-column integrated structure and construction method thereof
A pile and column slab technology, which is applied in the integrated structure of the first insertion method and its construction field, can solve the problems of difficult transportation, difficult control of the combination effect of concrete and surrounding steel plates, etc., and achieve good integrity and easy control of construction quality , The effect of reducing the risk of damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0036] The application will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain related inventions, rather than to limit the invention. It should also be noted that, for ease of description, only parts related to the invention are shown in the drawings.
[0037] It should be noted that, in the case of no conflict, the embodiments in the present application and the features in the embodiments can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and embodiments.
[0038] refer to Figure 1 to Figure 7 As shown, the present invention provides an integrated pile-column structure of the first-insertion method, including: concrete support pile 1, steel pipe column 2, multiple shear rings 3, reinforcement assembly 4, anti-surge device 5 and core concrete.
[00...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


