Embodiment 1
[0044] A method for producing hot-rolled strip steel with a thickness of 1.0 mm using a CSP production line, the steps of which are as follows:
[0045] 1) After smelting, it is cast into a billet, and the thickness of the billet is controlled at 54mm by using a liquid core pressing method in the casting into a billet;
[0046] 2) Heating the slab, the heating temperature is controlled at 1203°C, and the heating time is 31min;
[0047] 3) Carry out secondary descaling on the slab: the pressure of the first descaling water is controlled at 181 bar, and the pressure of the second descaling water is 206 bar; and the first and second descaling upper header nozzles are controlled to the casting The distance between the blank surface is 55mm;
[0048] 4) Seven passes of rolling are carried out, and the operations in each stage are as follows:
[0049] In the threading stage, the thickness of the threading is 1.05mm; the threading speed is 9.5m / s, and after the threading is complet...
Embodiment 2
[0059] A method for producing hot-rolled strip steel with a thickness of 1.0 mm using a CSP production line, the steps of which are as follows:
[0060] 1) After smelting, it is cast into a billet, and the thickness of the billet is controlled at 52mm by using a liquid core pressing method in the casting into a billet;
[0061] 2) Heating the slab, the heating temperature is controlled at 1210°C, and the heating time is 33min;
[0062] 3) Carry out secondary descaling of the slab: the pressure of the first descaling water is controlled at 185 bar, and the pressure of the second descaling water is 208 bar; and the first and second descaling upper header nozzles are controlled to the slab The distance between the surfaces is 57mm;
[0063] 4) Seven passes of rolling are carried out, and the operations in each stage are as follows:
[0064] In the threading stage, the thickness of the threading is 1.05mm; the threading speed is 9.6m / s, and after the threading is completed, it i...
Embodiment 3
[0074] A method for producing hot-rolled strip steel with a thickness of 1.0 mm using a CSP production line, the steps of which are as follows:
[0075] 1) After smelting, it is cast into a billet, and the thickness of the billet is controlled at 55mm by using a liquid core pressing method in the casting into a billet;
[0076] 2) Heating the slab, the heating temperature is controlled at 1212°C, and the heating time is 35min;
[0077] 3) Carry out secondary descaling of the slab: the pressure of the first descaling water is controlled at 189 bar, and the pressure of the second descaling water is 209 bar; and the first and second descaling upper header nozzles are controlled to the slab The distance between the surfaces is 60mm;
[0078] 4) Seven passes of rolling are carried out, and the operations in each stage are as follows:
[0079] In the threading stage, the thickness of the threading is 1.05mm; the threading speed is 9.8m / s, and after the threading is completed, it i...
PUM
Property | Measurement | Unit |
---|---|---|
thickness | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com