Energy-absorbing yielding tunnel primary support structure system and construction method thereof
An initial support and tunnel technology, applied in the direction of tunnel, tunnel lining, earthwork drilling, etc., can solve the problems of poor deformation pressure buffer, loss of support effect, deformation instability and damage, etc., to achieve the effect of ensuring performance effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0035] The present invention is further described below in conjunction with an embodiment.
[0036] The following embodiments are used to illustrate the present invention, but can not be used to limit the scope of protection of the present invention. The conditions in the embodiments may be further adjusted according to specific conditions, and the methods of the present invention are simply improved under the premise of the concept of the present invention are within the scope of the claims of the present invention.
[0037] See Figure 1-5, the present invention provides a suction pressure tunnel initial support structure system, comprising I-beam A1 unit 2, I-beam A2 unit 3, I-beam A3 unit 4 and I-beam A4 unit 5, disposed on the inner side of the tunnel surrounding rock 1, for supporting the tunnel surrounding rock 1, I-beam A1 unit 2, I-beam A2 unit 3, I-beam A3 unit 4 and I-beam A4 unit 5 constitute the steel arch perimeter layer, I-beam A1 unit 2, I-beam A2 unit 3, I-beam A3 ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com